Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia
The Meninting Dam under construction on Lombok Island, West Nusa Tenggara, Indonesia, requires a good planning to build a diversion tunnel to support its development and mobilization. The diversion tunnel is planned to be built through rocks with medium to poor rock mass quality. The planning stage...
Guardado en:
Autores principales: | , , |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/024837401ec84e0c8528b080f37d8ef9 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:024837401ec84e0c8528b080f37d8ef9 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:024837401ec84e0c8528b080f37d8ef92021-12-02T17:11:56ZModified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia2267-124210.1051/e3sconf/202132502001https://doaj.org/article/024837401ec84e0c8528b080f37d8ef92021-01-01T00:00:00Zhttps://www.e3s-conferences.org/articles/e3sconf/pdf/2021/101/e3sconf_icst2021_02001.pdfhttps://doaj.org/toc/2267-1242The Meninting Dam under construction on Lombok Island, West Nusa Tenggara, Indonesia, requires a good planning to build a diversion tunnel to support its development and mobilization. The diversion tunnel is planned to be built through rocks with medium to poor rock mass quality. The planning stage involves various parameters, i.e., the rock mass classification, using either the RMR or GSI method. Converting values from one method to another makes planning work easier. However, the constraints found were the limitations of the observational data, such as discontinuity conditions. The objective of this article is to discuss the alternative depiction of discontinuity conditions in rock mass using RMR method. An alternative equation was developed to obtain a prediction model for determining the RMR value, based on GSI data. The evaluation showed that the mathematical models developed in this research had a small gap of error compared to other values. The models then can be used to predict RMR value based on GSI data and vice versa, with a higher degree of accuracy and precision according to the actual rock surface conditions, especially in the construction site of diversion tunnel at Meninting Dam.Wijaya Brilyan JatiWarmada I WayanIndrawan I Gde BudiEDP SciencesarticleEnvironmental sciencesGE1-350ENFRE3S Web of Conferences, Vol 325, p 02001 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN FR |
topic |
Environmental sciences GE1-350 |
spellingShingle |
Environmental sciences GE1-350 Wijaya Brilyan Jati Warmada I Wayan Indrawan I Gde Budi Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
description |
The Meninting Dam under construction on Lombok Island, West Nusa Tenggara, Indonesia, requires a good planning to build a diversion tunnel to support its development and mobilization. The diversion tunnel is planned to be built through rocks with medium to poor rock mass quality. The planning stage involves various parameters, i.e., the rock mass classification, using either the RMR or GSI method. Converting values from one method to another makes planning work easier. However, the constraints found were the limitations of the observational data, such as discontinuity conditions. The objective of this article is to discuss the alternative depiction of discontinuity conditions in rock mass using RMR method. An alternative equation was developed to obtain a prediction model for determining the RMR value, based on GSI data. The evaluation showed that the mathematical models developed in this research had a small gap of error compared to other values. The models then can be used to predict RMR value based on GSI data and vice versa, with a higher degree of accuracy and precision according to the actual rock surface conditions, especially in the construction site of diversion tunnel at Meninting Dam. |
format |
article |
author |
Wijaya Brilyan Jati Warmada I Wayan Indrawan I Gde Budi |
author_facet |
Wijaya Brilyan Jati Warmada I Wayan Indrawan I Gde Budi |
author_sort |
Wijaya Brilyan Jati |
title |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
title_short |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
title_full |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
title_fullStr |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
title_full_unstemmed |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia |
title_sort |
modified rmr to determine rock mass quality, study case of diversion tunnel in meninting dam, west nusa tenggara, indonesia |
publisher |
EDP Sciences |
publishDate |
2021 |
url |
https://doaj.org/article/024837401ec84e0c8528b080f37d8ef9 |
work_keys_str_mv |
AT wijayabrilyanjati modifiedrmrtodeterminerockmassqualitystudycaseofdiversiontunnelinmenintingdamwestnusatenggaraindonesia AT warmadaiwayan modifiedrmrtodeterminerockmassqualitystudycaseofdiversiontunnelinmenintingdamwestnusatenggaraindonesia AT indrawanigdebudi modifiedrmrtodeterminerockmassqualitystudycaseofdiversiontunnelinmenintingdamwestnusatenggaraindonesia |
_version_ |
1718381417846538240 |