Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran

The present study aims at presenting the pathological model of the process of collaboration between the public and nongovernmental sectors as one of the key factors affecting project performance utilizing multi-case research method as well as the grounded theory for data analysis. This research trie...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: yousef Shahbazi Razlighi, mohammad hossein sobhiyah, Hasan Danaeefard
Formato: article
Lenguaje:FA
Publicado: Iranian Society of Structrual Engineering (ISSE) 2020
Materias:
ppp
bot
Acceso en línea:https://doaj.org/article/0337751325a944c6b94b3a68cbe194fb
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:0337751325a944c6b94b3a68cbe194fb
record_format dspace
spelling oai:doaj.org-article:0337751325a944c6b94b3a68cbe194fb2021-11-08T15:54:03ZObstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran2476-39772538-261610.22065/jsce.2019.134930.1589https://doaj.org/article/0337751325a944c6b94b3a68cbe194fb2020-10-01T00:00:00Zhttps://www.jsce.ir/article_81546_cda07ebfcd59901df151dfd29db6e4a9.pdfhttps://doaj.org/toc/2476-3977https://doaj.org/toc/2538-2616The present study aims at presenting the pathological model of the process of collaboration between the public and nongovernmental sectors as one of the key factors affecting project performance utilizing multi-case research method as well as the grounded theory for data analysis. This research tries to find quality partnerships for implementing projects that are delivered by BOT. These drivers will include the causal conditions, structures, processes, and mechanisms of actors involved in public-private partnerships. In this regard, at first step, by reviewing the literature, the approach of developed and developing countries, and the way, in which, the parties engage in different contexts are investigated.Then, the required data is collected to be used in the grounded theory by referring to the successful and unsuccessful cases in collaboration between the governmental and nongovernmental sections, and conducting interviews with different individuals from different levels of management from both sectors, attending meetings of the committee of investment companies in the construction of Iranian freeways and memorization from our observations of how the dialogue, behavior and interaction of the parties. Then, by analyzing the acquired data, the Pathology Model of the collaborative process between public sector and non-governmental sector in BOT freeway projects is developed.According the obtained results in this study, the lack of respect, risk coverage, and joint decision making constitute the phenomenon of undesirable partnership. Finally, while comparing this research findings with those existing in the literature, executive suggestions are made to reduce challenges and promote existing collaborative efforts.yousef Shahbazi Razlighimohammad hossein sobhiyahHasan DanaeefardIranian Society of Structrual Engineering (ISSE)articlepppcollaborationpartnershipbotiran freeway industryBridge engineeringTG1-470Building constructionTH1-9745FAJournal of Structural and Construction Engineering, Vol 7, Iss شماره ویژه 3, Pp 109-129 (2020)
institution DOAJ
collection DOAJ
language FA
topic ppp
collaboration
partnership
bot
iran freeway industry
Bridge engineering
TG1-470
Building construction
TH1-9745
spellingShingle ppp
collaboration
partnership
bot
iran freeway industry
Bridge engineering
TG1-470
Building construction
TH1-9745
yousef Shahbazi Razlighi
mohammad hossein sobhiyah
Hasan Danaeefard
Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
description The present study aims at presenting the pathological model of the process of collaboration between the public and nongovernmental sectors as one of the key factors affecting project performance utilizing multi-case research method as well as the grounded theory for data analysis. This research tries to find quality partnerships for implementing projects that are delivered by BOT. These drivers will include the causal conditions, structures, processes, and mechanisms of actors involved in public-private partnerships. In this regard, at first step, by reviewing the literature, the approach of developed and developing countries, and the way, in which, the parties engage in different contexts are investigated.Then, the required data is collected to be used in the grounded theory by referring to the successful and unsuccessful cases in collaboration between the governmental and nongovernmental sections, and conducting interviews with different individuals from different levels of management from both sectors, attending meetings of the committee of investment companies in the construction of Iranian freeways and memorization from our observations of how the dialogue, behavior and interaction of the parties. Then, by analyzing the acquired data, the Pathology Model of the collaborative process between public sector and non-governmental sector in BOT freeway projects is developed.According the obtained results in this study, the lack of respect, risk coverage, and joint decision making constitute the phenomenon of undesirable partnership. Finally, while comparing this research findings with those existing in the literature, executive suggestions are made to reduce challenges and promote existing collaborative efforts.
format article
author yousef Shahbazi Razlighi
mohammad hossein sobhiyah
Hasan Danaeefard
author_facet yousef Shahbazi Razlighi
mohammad hossein sobhiyah
Hasan Danaeefard
author_sort yousef Shahbazi Razlighi
title Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
title_short Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
title_full Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
title_fullStr Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
title_full_unstemmed Obstacles to Public and Nongovernmental Collaboration in BOT Freeway Projects in Iran
title_sort obstacles to public and nongovernmental collaboration in bot freeway projects in iran
publisher Iranian Society of Structrual Engineering (ISSE)
publishDate 2020
url https://doaj.org/article/0337751325a944c6b94b3a68cbe194fb
work_keys_str_mv AT yousefshahbazirazlighi obstaclestopublicandnongovernmentalcollaborationinbotfreewayprojectsiniran
AT mohammadhosseinsobhiyah obstaclestopublicandnongovernmentalcollaborationinbotfreewayprojectsiniran
AT hasandanaeefard obstaclestopublicandnongovernmentalcollaborationinbotfreewayprojectsiniran
_version_ 1718441538930868224