A Study of the Effects of Geological Conditions on Korean Tunnel Construction Time Using the Updated NTNU Drill and Blast Prediction Model
This paper analyses the construction time and advance rate of a 3 km long drill and blast tunnel under various geological conditions using an upgraded NTNU drill and blast prediction model. The analysis was carried out for the five types of Korean tunnel supports according to the rock mass quality (...
Saved in:
Main Authors: | Yangkyun Kim, Sean Seungwon Lee |
---|---|
Format: | article |
Language: | EN |
Published: |
MDPI AG
2021
|
Subjects: | |
Online Access: | https://doaj.org/article/070ac50b2fae448ea81c0ee9371e0aea |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Numerical Simulation of Rock Mass Structure Effect on Tunnel Smooth Blasting Quality: A Case Study
by: Jianxiu Wang, et al.
Published: (2021) -
The Femoral Tunnel Drilling Angle at 45° Coronal and 45° Sagittal Provided the Lowest Peak Stress and Strain on the Bone Tunnels and Anterior Cruciate Ligament Graft
by: Rongshan Cheng, et al.
Published: (2021) -
ANOVA OPTIMIZATION OF DRILL BIT TEMPERATURE IN DRILLING OF PURE AND CARBON BLACK REINFORCED HIGH DENSITY POLYETHYLENE
by: ALPER UYSAL
Published: (2019) -
Improvement of Working Conditions of Mining Workers by Reducing Nitrogen Oxide Emissions during Blasting Operations
by: Marat Rudakov, et al.
Published: (2021) -
The Effect of Soil Content, Drilling Parameters and Drilling Tool Diameter on the Vibration Assessment in the Drilling Rig
by: Mauwafak Ali Tawfik, et al.
Published: (2014)