Justification criteria for Inter-Basin Water Transfer Projects
When implemented on a large scale, Interbasin Water Transfer (IBWT) projects are one of the most significant human interventions in natural environmental processes. Although water transfer might have considerable beneficial impacts, it produces inevitably other adverse effects on different levels. T...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/0892cd3fa2b34aa6ad7efb1406f541b3 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:0892cd3fa2b34aa6ad7efb1406f541b3 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:0892cd3fa2b34aa6ad7efb1406f541b32021-11-08T15:19:09ZJustification criteria for Inter-Basin Water Transfer Projects2267-124210.1051/e3sconf/202131406001https://doaj.org/article/0892cd3fa2b34aa6ad7efb1406f541b32021-01-01T00:00:00Zhttps://www.e3s-conferences.org/articles/e3sconf/pdf/2021/90/e3sconf_wmad2021_06001.pdfhttps://doaj.org/toc/2267-1242When implemented on a large scale, Interbasin Water Transfer (IBWT) projects are one of the most significant human interventions in natural environmental processes. Although water transfer might have considerable beneficial impacts, it produces inevitably other adverse effects on different levels. The present work aims to assess the phenomenon of IBWT to answer the question of whether such transfers are justified or not. To this end, this paper is first introduced by reviewing criteria proposed by some international organizations and epistemic communities for assessing IBWT. Then, a coherent set of IBWT evaluation criteria are proposed. Afterward, the authors have applied the chosen criteria to the North-South Water Transfer Project (NSWTP) in Morocco to provide a global assessment. The results show that the NSWTP, in its current version, is not justified. To remedy the negative sides of this project, the authors propose to limit the water transfer only between Sebou (donor) and Bouregreg (recipient), all in increasing the storage capacity of the recipient reservoir. On the other hand, studies related to the legal and institutional sides, and the ecological impacts are to be finalized.Laassilia OussamaOuazar DrissBouziane AhmedHasnaoui Moulay DrissEDP SciencesarticleEnvironmental sciencesGE1-350ENFRE3S Web of Conferences, Vol 314, p 06001 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN FR |
topic |
Environmental sciences GE1-350 |
spellingShingle |
Environmental sciences GE1-350 Laassilia Oussama Ouazar Driss Bouziane Ahmed Hasnaoui Moulay Driss Justification criteria for Inter-Basin Water Transfer Projects |
description |
When implemented on a large scale, Interbasin Water Transfer (IBWT) projects are one of the most significant human interventions in natural environmental processes. Although water transfer might have considerable beneficial impacts, it produces inevitably other adverse effects on different levels. The present work aims to assess the phenomenon of IBWT to answer the question of whether such transfers are justified or not. To this end, this paper is first introduced by reviewing criteria proposed by some international organizations and epistemic communities for assessing IBWT. Then, a coherent set of IBWT evaluation criteria are proposed. Afterward, the authors have applied the chosen criteria to the North-South Water Transfer Project (NSWTP) in Morocco to provide a global assessment. The results show that the NSWTP, in its current version, is not justified. To remedy the negative sides of this project, the authors propose to limit the water transfer only between Sebou (donor) and Bouregreg (recipient), all in increasing the storage capacity of the recipient reservoir. On the other hand, studies related to the legal and institutional sides, and the ecological impacts are to be finalized. |
format |
article |
author |
Laassilia Oussama Ouazar Driss Bouziane Ahmed Hasnaoui Moulay Driss |
author_facet |
Laassilia Oussama Ouazar Driss Bouziane Ahmed Hasnaoui Moulay Driss |
author_sort |
Laassilia Oussama |
title |
Justification criteria for Inter-Basin Water Transfer Projects |
title_short |
Justification criteria for Inter-Basin Water Transfer Projects |
title_full |
Justification criteria for Inter-Basin Water Transfer Projects |
title_fullStr |
Justification criteria for Inter-Basin Water Transfer Projects |
title_full_unstemmed |
Justification criteria for Inter-Basin Water Transfer Projects |
title_sort |
justification criteria for inter-basin water transfer projects |
publisher |
EDP Sciences |
publishDate |
2021 |
url |
https://doaj.org/article/0892cd3fa2b34aa6ad7efb1406f541b3 |
work_keys_str_mv |
AT laassiliaoussama justificationcriteriaforinterbasinwatertransferprojects AT ouazardriss justificationcriteriaforinterbasinwatertransferprojects AT bouzianeahmed justificationcriteriaforinterbasinwatertransferprojects AT hasnaouimoulaydriss justificationcriteriaforinterbasinwatertransferprojects |
_version_ |
1718441917366140928 |