Time-Cost-Quality trade off in Critical Chain Method with multi mode activities by Multi Objective Particle Swarm Optimization
Believing in the fact that an activity can be performed through several methods or states, or that there may be several executive states for activities with different numbers of resources in real conditions, the scheduling obtained from different methods with different combinations of time, resource...
Guardado en:
Autores principales: | Mohammad Javad Taheri Amiri, farshidreza haghighi, Ehsan Eshtehardian, ozeair abessi |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
Iranian Society of Structrual Engineering (ISSE)
2019
|
Materias: | |
Acceso en línea: | https://doaj.org/article/0e7db31c43cf4a81a6f9c68901f5bde8 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function
por: Mohammad Javad Taheri Amiri, et al.
Publicado: (2020) -
A Multi-Objective Particle Swarm Optimization for Trajectory Planning of Fruit Picking Manipulator
por: Xiaoman Cao, et al.
Publicado: (2021) -
Pareto-Based Bi-Objective Optimization Method of Sensor Placement in Structural Health Monitoring
por: Shao-Xiao Nong, et al.
Publicado: (2021) -
Optimization of Reinforced Concrete Reservoir with Circumferential Stiffeners Strips by Particle Swarm Algorithm
por: GholamReza Havaei, et al.
Publicado: (2015) -
Evaluation of bridges of Mazandaran province using multi-criteria decision methods based on existing failures
por: Mohammad Javad Taheri Amiri, et al.
Publicado: (2020)