Work breakdown structure application for man-hours calculation in hull construction shipbuilding in Malaysia
In Malaysia, the majority of oil & gas platform construction use fixed type substructure such as jacket type platform. To date, only one Semi-FPS has been constructed in Malaysia involving complex and challenging issues in the construction of hull substructure. Oil & gas project managers hav...
Guardado en:
Autores principales: | W. A. Z. Wan Abd Rahman, N. I. Mohd Zaki, M. K. Abu Husain |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Taylor & Francis Group
2019
|
Materias: | |
Acceso en línea: | https://doaj.org/article/14ec373badb14abea3443a57b28f4a3d |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Analysis of plated-hull structure strength against hydrostatic and hydrodynamic loads: A case study of 600 TEU container ships
por: Akbar Muhammad Sabiqulkhair, et al.
Publicado: (2021) -
A digital twin of the ship hull, purpose and main principles of development
por: Anton R. Filatov
Publicado: (2021) -
Research and Implementation of Lean Production Mode in Shipbuilding
por: Tingxin Song, et al.
Publicado: (2021) -
Biosorption of lead(II) and chromium(VI) on groundnut hull: Equilibrium, kinetics and thermodynamics study
por: Qaiser,Suleman, et al.
Publicado: (2009) -
Electric Field Distribution and AC Breakdown Characteristics of Polluted Novel Lightning Protection Insulator under Icing Conditions
por: Jiazheng Lu, et al.
Publicado: (2021)