Complex Curved Storefront: The Looking Glass

A bespoke structural glass storefront is designed for the P.C. Hooftstraat 138. Developer Warenar Real Estate assembled a design team with UNStudio, Arup and Octatube. The façade features twisted geometries with precisely detailed glass connections and custom non-orthogonal steel and glass doors. At...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Chris Noteboom, Peter Lenk, Iris Rombouts, Erik van der Thiel
Formato: article
Lenguaje:EN
Publicado: Challenging Glass Conference 2020
Materias:
Acceso en línea:https://doaj.org/article/196cc7986d984c14b57d0969d224a770
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:196cc7986d984c14b57d0969d224a770
record_format dspace
spelling oai:doaj.org-article:196cc7986d984c14b57d0969d224a7702021-12-04T05:11:42ZComplex Curved Storefront: The Looking Glass10.7480/cgc.7.46072589-8019https://doaj.org/article/196cc7986d984c14b57d0969d224a7702020-09-01T00:00:00Zhttps://proceedings.challengingglass.com/index.php/cgc/article/view/303https://doaj.org/toc/2589-8019A bespoke structural glass storefront is designed for the P.C. Hooftstraat 138. Developer Warenar Real Estate assembled a design team with UNStudio, Arup and Octatube. The façade features twisted geometries with precisely detailed glass connections and custom non-orthogonal steel and glass doors. At ground floor level the facade starts flush with adjacent buildings but rising up it also leans and cantilevers outwards to become more visible from a distance. For optimal quality and minimalistic detailing, a scheme was designed in which most elements could be pre-assembled in the factory into three large 2m x 8,5m high units. Connections between curved glass elements are all glued in combination with stainless steel elements for edge protection and emphasis on the curved geometry. Risk of thermal breakage of annealed curved elements that are partially inside and partially outside is minimized by gluing stainless steel plates to the glass elements that act as cooling ribs. Frequent collaboration throughout the whole project between all parties resulted in successful delivery with no glass breakage during the construction phase. It took years to design, months to assemble in factory, but only 2 days to construct on site. Chris NoteboomPeter LenkIris RomboutsErik van der ThielChallenging Glass Conferencearticleglasscurved glassstructural sealantprefabricationstructural siliconeClay industries. Ceramics. GlassTP785-869ENChallenging Glass Conference Proceedings, Vol 7, Iss 1 (2020)
institution DOAJ
collection DOAJ
language EN
topic glass
curved glass
structural sealant
prefabrication
structural silicone
Clay industries. Ceramics. Glass
TP785-869
spellingShingle glass
curved glass
structural sealant
prefabrication
structural silicone
Clay industries. Ceramics. Glass
TP785-869
Chris Noteboom
Peter Lenk
Iris Rombouts
Erik van der Thiel
Complex Curved Storefront: The Looking Glass
description A bespoke structural glass storefront is designed for the P.C. Hooftstraat 138. Developer Warenar Real Estate assembled a design team with UNStudio, Arup and Octatube. The façade features twisted geometries with precisely detailed glass connections and custom non-orthogonal steel and glass doors. At ground floor level the facade starts flush with adjacent buildings but rising up it also leans and cantilevers outwards to become more visible from a distance. For optimal quality and minimalistic detailing, a scheme was designed in which most elements could be pre-assembled in the factory into three large 2m x 8,5m high units. Connections between curved glass elements are all glued in combination with stainless steel elements for edge protection and emphasis on the curved geometry. Risk of thermal breakage of annealed curved elements that are partially inside and partially outside is minimized by gluing stainless steel plates to the glass elements that act as cooling ribs. Frequent collaboration throughout the whole project between all parties resulted in successful delivery with no glass breakage during the construction phase. It took years to design, months to assemble in factory, but only 2 days to construct on site.
format article
author Chris Noteboom
Peter Lenk
Iris Rombouts
Erik van der Thiel
author_facet Chris Noteboom
Peter Lenk
Iris Rombouts
Erik van der Thiel
author_sort Chris Noteboom
title Complex Curved Storefront: The Looking Glass
title_short Complex Curved Storefront: The Looking Glass
title_full Complex Curved Storefront: The Looking Glass
title_fullStr Complex Curved Storefront: The Looking Glass
title_full_unstemmed Complex Curved Storefront: The Looking Glass
title_sort complex curved storefront: the looking glass
publisher Challenging Glass Conference
publishDate 2020
url https://doaj.org/article/196cc7986d984c14b57d0969d224a770
work_keys_str_mv AT chrisnoteboom complexcurvedstorefrontthelookingglass
AT peterlenk complexcurvedstorefrontthelookingglass
AT irisrombouts complexcurvedstorefrontthelookingglass
AT erikvanderthiel complexcurvedstorefrontthelookingglass
_version_ 1718372838254051328