Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times

This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to minimize a weighted sum of total tardiness of u...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: BongJoo Jeong, Jun-Hee Han, Ju-Yong Lee
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
Acceso en línea:https://doaj.org/article/1ad67c6128af4c4b8d80aa3f94064284
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!