Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure

In the traditional construction projects, project shareholders develop their projects rather by taking the cost into consideration after the occurrence of the need. The companies should focus on quality, cost and speed in the projects they carry out to be able to keep up in the competitive environme...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Şenay Atabay
Formato: article
Lenguaje:EN
Publicado: Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek 2021
Materias:
Acceso en línea:https://doaj.org/article/1d82bb642b7241e5af59c33be38288fc
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:1d82bb642b7241e5af59c33be38288fc
record_format dspace
spelling oai:doaj.org-article:1d82bb642b7241e5af59c33be38288fc2021-11-07T00:39:22ZValue Engineering for the Selection of the Filler Material between Shoring Wall and the Structure1330-36511848-6339https://doaj.org/article/1d82bb642b7241e5af59c33be38288fc2021-01-01T00:00:00Zhttps://hrcak.srce.hr/file/383620https://doaj.org/toc/1330-3651https://doaj.org/toc/1848-6339In the traditional construction projects, project shareholders develop their projects rather by taking the cost into consideration after the occurrence of the need. The companies should focus on quality, cost and speed in the projects they carry out to be able to keep up in the competitive environment. Value engineering is the revision of the new or existent products at the design stage for the purpose of increasing the value of the product, decreasing the cost and increasing the functionality. In this study, it has been tried to decide which material / method should be selected to be able to fill the space between a shoring wall and the structure with the use of Value Engineering Method. Firstly, a value engineering team has been formed; it has been decided which needs the material / method should meet, solutions that could provide these needs have been sought and it has been decided to compare three determined alternative solutions. Afterwards, value analysis has been conducted and the solution that can meet the need both in terms of quality and cost has been tried to be selected. In this way, economically most convenient solution has been determined without neglecting the requests of the customers and the benefit to be attained. As a result of the Value Engineering study, it was concluded that Alternative 2b (making waste mold with profile and 15 mm oriented strand board) is the most suitable solution.Şenay AtabayFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek articleconstruction managementgeotechnical engineeringselection of materialshoring wallvalue analysisvalue managementEngineering (General). Civil engineering (General)TA1-2040ENTehnički Vjesnik, Vol 28, Iss 6, Pp 2164-2172 (2021)
institution DOAJ
collection DOAJ
language EN
topic construction management
geotechnical engineering
selection of material
shoring wall
value analysis
value management
Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle construction management
geotechnical engineering
selection of material
shoring wall
value analysis
value management
Engineering (General). Civil engineering (General)
TA1-2040
Şenay Atabay
Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
description In the traditional construction projects, project shareholders develop their projects rather by taking the cost into consideration after the occurrence of the need. The companies should focus on quality, cost and speed in the projects they carry out to be able to keep up in the competitive environment. Value engineering is the revision of the new or existent products at the design stage for the purpose of increasing the value of the product, decreasing the cost and increasing the functionality. In this study, it has been tried to decide which material / method should be selected to be able to fill the space between a shoring wall and the structure with the use of Value Engineering Method. Firstly, a value engineering team has been formed; it has been decided which needs the material / method should meet, solutions that could provide these needs have been sought and it has been decided to compare three determined alternative solutions. Afterwards, value analysis has been conducted and the solution that can meet the need both in terms of quality and cost has been tried to be selected. In this way, economically most convenient solution has been determined without neglecting the requests of the customers and the benefit to be attained. As a result of the Value Engineering study, it was concluded that Alternative 2b (making waste mold with profile and 15 mm oriented strand board) is the most suitable solution.
format article
author Şenay Atabay
author_facet Şenay Atabay
author_sort Şenay Atabay
title Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
title_short Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
title_full Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
title_fullStr Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
title_full_unstemmed Value Engineering for the Selection of the Filler Material between Shoring Wall and the Structure
title_sort value engineering for the selection of the filler material between shoring wall and the structure
publisher Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
publishDate 2021
url https://doaj.org/article/1d82bb642b7241e5af59c33be38288fc
work_keys_str_mv AT senayatabay valueengineeringfortheselectionofthefillermaterialbetweenshoringwallandthestructure
_version_ 1718443596441452544