On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines
The issue of wastewater treatment in open-pit mining of mineral deposits is associated with great difficulties. Due to the constant tightening of requirements for the quality of discharged wastewater, its treatment in the sedimentation reservoirs and clarification ponds does not ensure the achieveme...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/1fe9f48a8443475cbaebfb3d540e729b |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:1fe9f48a8443475cbaebfb3d540e729b |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:1fe9f48a8443475cbaebfb3d540e729b2021-11-08T15:19:21ZOn the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines2267-124210.1051/e3sconf/202131502013https://doaj.org/article/1fe9f48a8443475cbaebfb3d540e729b2021-01-01T00:00:00Zhttps://www.e3s-conferences.org/articles/e3sconf/pdf/2021/91/e3sconf_iims2021_02013.pdfhttps://doaj.org/toc/2267-1242The issue of wastewater treatment in open-pit mining of mineral deposits is associated with great difficulties. Due to the constant tightening of requirements for the quality of discharged wastewater, its treatment in the sedimentation reservoirs and clarification ponds does not ensure the achievement of MPC values; in addition, these treatment facilities occupy significant areas of land. It should also be noted that the open-pit mines, as a rule, have several water outlets remote from each other, besides changing their location as the development of mining operations proceeds. For example, OJSC "UK "Kuzbassrazrezugol" has more than 30 places of water use, taking into account that the company structure includes 7 open-pit mines. In the article some results of analyses of pit waste water before and after its treatment in artificial filtering massifs at the mining enterprises of Kuzbass are presented. Preliminary dependences of changes in pollutant impurities in quarry water on different composition of coal waste have been established.Murko ElenaJanočko JurajMakridin EugeneKapko MartinEDP SciencesarticleEnvironmental sciencesGE1-350ENFRE3S Web of Conferences, Vol 315, p 02013 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN FR |
topic |
Environmental sciences GE1-350 |
spellingShingle |
Environmental sciences GE1-350 Murko Elena Janočko Juraj Makridin Eugene Kapko Martin On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
description |
The issue of wastewater treatment in open-pit mining of mineral deposits is associated with great difficulties. Due to the constant tightening of requirements for the quality of discharged wastewater, its treatment in the sedimentation reservoirs and clarification ponds does not ensure the achievement of MPC values; in addition, these treatment facilities occupy significant areas of land. It should also be noted that the open-pit mines, as a rule, have several water outlets remote from each other, besides changing their location as the development of mining operations proceeds. For example, OJSC "UK "Kuzbassrazrezugol" has more than 30 places of water use, taking into account that the company structure includes 7 open-pit mines. In the article some results of analyses of pit waste water before and after its treatment in artificial filtering massifs at the mining enterprises of Kuzbass are presented. Preliminary dependences of changes in pollutant impurities in quarry water on different composition of coal waste have been established. |
format |
article |
author |
Murko Elena Janočko Juraj Makridin Eugene Kapko Martin |
author_facet |
Murko Elena Janočko Juraj Makridin Eugene Kapko Martin |
author_sort |
Murko Elena |
title |
On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
title_short |
On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
title_full |
On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
title_fullStr |
On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
title_full_unstemmed |
On the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
title_sort |
on the need to consider the lithological composition of overburden rocks in the design of waste water treatment plants at open pit mines |
publisher |
EDP Sciences |
publishDate |
2021 |
url |
https://doaj.org/article/1fe9f48a8443475cbaebfb3d540e729b |
work_keys_str_mv |
AT murkoelena ontheneedtoconsiderthelithologicalcompositionofoverburdenrocksinthedesignofwastewatertreatmentplantsatopenpitmines AT janockojuraj ontheneedtoconsiderthelithologicalcompositionofoverburdenrocksinthedesignofwastewatertreatmentplantsatopenpitmines AT makridineugene ontheneedtoconsiderthelithologicalcompositionofoverburdenrocksinthedesignofwastewatertreatmentplantsatopenpitmines AT kapkomartin ontheneedtoconsiderthelithologicalcompositionofoverburdenrocksinthedesignofwastewatertreatmentplantsatopenpitmines |
_version_ |
1718441923742531584 |