Matching control of energy recovery retarder for electric semi-trailer train

In order to improve the serious problem of "[KG-*2]collision" when the retarder is installed in the transmission system of a semi-trailer vehicle,and to improve the braking energy recovery rate during retarding conditions,a scheme of energy recovery type retarder installed in the hub on bo...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Mengwen NIE, Kun YANG, Jie WANG, Chao MA, Jinzhao XIAO, Shuliang TAN
Formato: article
Lenguaje:ZH
Publicado: Hebei University of Science and Technology 2021
Materias:
T
Acceso en línea:https://doaj.org/article/2d034a73b54b4b08aa915ab9cf18f307
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:2d034a73b54b4b08aa915ab9cf18f307
record_format dspace
spelling oai:doaj.org-article:2d034a73b54b4b08aa915ab9cf18f3072021-11-23T07:08:58ZMatching control of energy recovery retarder for electric semi-trailer train1008-154210.7535/hbkd.2021yx04003https://doaj.org/article/2d034a73b54b4b08aa915ab9cf18f3072021-08-01T00:00:00Zhttp://xuebao.hebust.edu.cn/hbkjdx/ch/reader/create_pdf.aspx?file_no=b202104003&flag=1&journal_https://doaj.org/toc/1008-1542In order to improve the serious problem of "[KG-*2]collision" when the retarder is installed in the transmission system of a semi-trailer vehicle,and to improve the braking energy recovery rate during retarding conditions,a scheme of energy recovery type retarder installed in the hub on both sides of the front axle of semi-trailer was proposed.According to the regulation of retarder braking performance in GB/T 32692-2016,the retarder parameters were matched,and the corresponding retarder control strategy was proposed.According to the quality requirements of the electric semitrailer train in the control strategy,the quality estimation algorithm was studied,and based on the particle swarm algorithm,the braking torque distribution at low braking intensity was studied.A joint simulation platform was built through Matlab/Simulink and TruckSim to simulate and verify the quality estimation algorithm,the economy of electric semitrailer trains and braking safety.The simulation results show that the quality estimation algorithm can accurately estimate the quality of electric semitrailer trains; the energy recovery retarder can meet the retardation requirements of electric semi-trailer vehicles,improve the braking energy recovery rate,and can effectively improve the "[KG-*2]collision" problem of the electric semi-trailer train during slow braking.Related research provides new ideas for improving the braking energy recovery rate of electric semi-trailer vehicles during slow braking,and can improve the "[KG-*2]collision" problem and improve braking safety.Mengwen NIEKun YANGJie WANGChao MAJinzhao XIAOShuliang TANHebei University of Science and Technologyarticlevehicle engineering; electric semi-trailer train; energy recovery retarder; control strategy; quality estimation; particle swarm optimizationTechnologyTZHJournal of Hebei University of Science and Technology, Vol 42, Iss 4, Pp 334-344 (2021)
institution DOAJ
collection DOAJ
language ZH
topic vehicle engineering; electric semi-trailer train; energy recovery retarder; control strategy; quality estimation; particle swarm optimization
Technology
T
spellingShingle vehicle engineering; electric semi-trailer train; energy recovery retarder; control strategy; quality estimation; particle swarm optimization
Technology
T
Mengwen NIE
Kun YANG
Jie WANG
Chao MA
Jinzhao XIAO
Shuliang TAN
Matching control of energy recovery retarder for electric semi-trailer train
description In order to improve the serious problem of "[KG-*2]collision" when the retarder is installed in the transmission system of a semi-trailer vehicle,and to improve the braking energy recovery rate during retarding conditions,a scheme of energy recovery type retarder installed in the hub on both sides of the front axle of semi-trailer was proposed.According to the regulation of retarder braking performance in GB/T 32692-2016,the retarder parameters were matched,and the corresponding retarder control strategy was proposed.According to the quality requirements of the electric semitrailer train in the control strategy,the quality estimation algorithm was studied,and based on the particle swarm algorithm,the braking torque distribution at low braking intensity was studied.A joint simulation platform was built through Matlab/Simulink and TruckSim to simulate and verify the quality estimation algorithm,the economy of electric semitrailer trains and braking safety.The simulation results show that the quality estimation algorithm can accurately estimate the quality of electric semitrailer trains; the energy recovery retarder can meet the retardation requirements of electric semi-trailer vehicles,improve the braking energy recovery rate,and can effectively improve the "[KG-*2]collision" problem of the electric semi-trailer train during slow braking.Related research provides new ideas for improving the braking energy recovery rate of electric semi-trailer vehicles during slow braking,and can improve the "[KG-*2]collision" problem and improve braking safety.
format article
author Mengwen NIE
Kun YANG
Jie WANG
Chao MA
Jinzhao XIAO
Shuliang TAN
author_facet Mengwen NIE
Kun YANG
Jie WANG
Chao MA
Jinzhao XIAO
Shuliang TAN
author_sort Mengwen NIE
title Matching control of energy recovery retarder for electric semi-trailer train
title_short Matching control of energy recovery retarder for electric semi-trailer train
title_full Matching control of energy recovery retarder for electric semi-trailer train
title_fullStr Matching control of energy recovery retarder for electric semi-trailer train
title_full_unstemmed Matching control of energy recovery retarder for electric semi-trailer train
title_sort matching control of energy recovery retarder for electric semi-trailer train
publisher Hebei University of Science and Technology
publishDate 2021
url https://doaj.org/article/2d034a73b54b4b08aa915ab9cf18f307
work_keys_str_mv AT mengwennie matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
AT kunyang matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
AT jiewang matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
AT chaoma matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
AT jinzhaoxiao matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
AT shuliangtan matchingcontrolofenergyrecoveryretarderforelectricsemitrailertrain
_version_ 1718416815517859840