Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times
The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with e...
Guardado en:
Autores principales: | , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/2fa7e825f98b47a3a85bd9d93d13b286 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:2fa7e825f98b47a3a85bd9d93d13b286 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:2fa7e825f98b47a3a85bd9d93d13b2862021-11-11T16:09:24ZAnalysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times10.3390/en142174461996-1073https://doaj.org/article/2fa7e825f98b47a3a85bd9d93d13b2862021-11-01T00:00:00Zhttps://www.mdpi.com/1996-1073/14/21/7446https://doaj.org/toc/1996-1073The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with exponentially distributed interarrival times and are carried out according to the times assumed as predefined. Tasks arriving from one waiting queue are handled in the order set by the Multi Objective Immune Algorithm. Tasks are stored in a finite-capacity buffer if machines are busy, or setup activities are being performed. Whenever a production system is idle, machines are stopped according to shutdown times in order to save energy. A machine requires setup time before executing the first batch of jobs after the idle time. Scientists agree that turning off an idle machine is a common measure that is appropriate for all types of workshops, but usually requires more steps, such as setup and shutdown. Literature analysis shows that there is a research gap regarding multi-objective algorithms, as minimizing energy consumption is not the only factor affecting the total manufacturing cost—there are other factors, such as late delivery cost or early delivery cost with additional storage cost, which make the optimization of the total cost of the production process more complicated. Another goal is to develop previous scheduling algorithms and research framework for energy efficient scheduling. The impact of the input data on the production system performance and energy consumption for series production is investigated in serial, parallel or serial–parallel flows. Parallel flow of upcoming tasks achieves minimum values of makespan criterion. Serial and serial–parallel flows of arriving tasks ensure minimum cost of energy consumption. Parallel flow of arriving tasks ensures minimum values of the costs of tardiness or premature execution. Parallel flow or serial–parallel flow of incoming tasks allows one to implement schedules with tasks that are not delayed.Adrian KampaIwona PaprockaMDPI AGarticleenergy-efficient schedulingflow shopserial–parallel flowmulti objective immune algorithmTechnologyTENEnergies, Vol 14, Iss 7446, p 7446 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
energy-efficient scheduling flow shop serial–parallel flow multi objective immune algorithm Technology T |
spellingShingle |
energy-efficient scheduling flow shop serial–parallel flow multi objective immune algorithm Technology T Adrian Kampa Iwona Paprocka Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
description |
The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with exponentially distributed interarrival times and are carried out according to the times assumed as predefined. Tasks arriving from one waiting queue are handled in the order set by the Multi Objective Immune Algorithm. Tasks are stored in a finite-capacity buffer if machines are busy, or setup activities are being performed. Whenever a production system is idle, machines are stopped according to shutdown times in order to save energy. A machine requires setup time before executing the first batch of jobs after the idle time. Scientists agree that turning off an idle machine is a common measure that is appropriate for all types of workshops, but usually requires more steps, such as setup and shutdown. Literature analysis shows that there is a research gap regarding multi-objective algorithms, as minimizing energy consumption is not the only factor affecting the total manufacturing cost—there are other factors, such as late delivery cost or early delivery cost with additional storage cost, which make the optimization of the total cost of the production process more complicated. Another goal is to develop previous scheduling algorithms and research framework for energy efficient scheduling. The impact of the input data on the production system performance and energy consumption for series production is investigated in serial, parallel or serial–parallel flows. Parallel flow of upcoming tasks achieves minimum values of makespan criterion. Serial and serial–parallel flows of arriving tasks ensure minimum cost of energy consumption. Parallel flow of arriving tasks ensures minimum values of the costs of tardiness or premature execution. Parallel flow or serial–parallel flow of incoming tasks allows one to implement schedules with tasks that are not delayed. |
format |
article |
author |
Adrian Kampa Iwona Paprocka |
author_facet |
Adrian Kampa Iwona Paprocka |
author_sort |
Adrian Kampa |
title |
Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
title_short |
Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
title_full |
Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
title_fullStr |
Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
title_full_unstemmed |
Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times |
title_sort |
analysis of energy efficient scheduling of the manufacturing line with finite buffer capacity and machine setup and shutdown times |
publisher |
MDPI AG |
publishDate |
2021 |
url |
https://doaj.org/article/2fa7e825f98b47a3a85bd9d93d13b286 |
work_keys_str_mv |
AT adriankampa analysisofenergyefficientschedulingofthemanufacturinglinewithfinitebuffercapacityandmachinesetupandshutdowntimes AT iwonapaprocka analysisofenergyefficientschedulingofthemanufacturinglinewithfinitebuffercapacityandmachinesetupandshutdowntimes |
_version_ |
1718432404916404224 |