Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times
The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with e...
Guardado en:
Autores principales: | Adrian Kampa, Iwona Paprocka |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/2fa7e825f98b47a3a85bd9d93d13b286 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Agent Scheduling in Unrelated Parallel Machines with Sequence- and Agent–Machine–Dependent Setup Time Problem
por: Jesús Isaac Vázquez-Serrano, et al.
Publicado: (2021) -
A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem
por: ZHAO Rui, et al.
Publicado: (2020) -
Multi-objective scheduling of relief logistics based on swarm intelligence algorithms and spatio-temporal traffic flow
por: Zhiming Ding, et al.
Publicado: (2021) -
Research on multi-heat-source scheduling strategy of heating system based on improved fireworks algorithm
por: Leilei Hui, et al.
Publicado: (2021) -
DESIGN OF A HYPERHEURISTIC FOR PRODUCTION SCHEDULING IN JOB SHOP ENVIRONMENTS
por: Castrillón,Omar Danilo, et al.
Publicado: (2010)