Cita APA (7a ed.)

Golik, O. V. (2016). STATISTICAL PROCEDURES FOR TWO-SIDED LIMIT OF A CONTROLLED PARAMETER IN THE PROCESS OF PRODUCTION OF CABLE AND WIRE PRODUCTS. National Technical University "Kharkiv Polytechnic Institute".

Cita Chicago Style (17a ed.)

Golik, O. V. STATISTICAL PROCEDURES FOR TWO-SIDED LIMIT OF A CONTROLLED PARAMETER IN THE PROCESS OF PRODUCTION OF CABLE AND WIRE PRODUCTS. National Technical University "Kharkiv Polytechnic Institute", 2016.

Cita MLA (8a ed.)

Golik, O. V. STATISTICAL PROCEDURES FOR TWO-SIDED LIMIT OF A CONTROLLED PARAMETER IN THE PROCESS OF PRODUCTION OF CABLE AND WIRE PRODUCTS. National Technical University "Kharkiv Polytechnic Institute", 2016.

Precaución: Estas citas no son 100% exactas.