Evaluation and optimization of flocculation-sedimentation-filtration process for addressing water-energy nexus challenges at Kemper IGCC power plant: Bench and pilot scale studies
The coal processing system at the Kemper County IGCC power plant featured a fluidized bed dryer system to dry high moisture lignite (> 45%). The system evaporated a large amount of water (60–70 KPPH) that was then used in other plant processes. The evaporated water contained 0.1–0.3% ultrafine pa...
Guardado en:
Autores principales: | Abhijit Bhagavatula, Venkat Rajagopalan, Brent Duncan, Pannalal Vimalchand |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Elsevier
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/35a14e22c89d44cb8bcd33a6325d9ed2 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Innovative recovered water process implementation: Flocculation-sedimentation-filtration process for addressing water and energy nexus challenges at Kemper IGCC Power Plant
por: Abhijit Bhagavatula, et al.
Publicado: (2021) -
Progress and utilization of Nakoso 250 MW air-blown IGCC demonstration project
por: Makoto NUNOKAWA, et al.
Publicado: (2014) -
Multiple-injection dry low-NOx combustor for hydrogen-rich syngas fuel: testing and evaluation of performance in an IGCC pilot plant
por: Tomohiro ASAI, et al.
Publicado: (2014) -
LABORATORY APPLICATIONS IN WASTEWATER TREATMENT BY USING FLOCCULATION PROCESS
por: NARCIS BARSAN, et al.
Publicado: (2017) -
GASIFICACIÓN DE CARBÓN PARA GENERACIÓN DE ENERGÍA ELÉCTRICA: ANÁLISIS CON VALORACIÓN DE OPCIONES REALES
por: Concha A,Alejandro, et al.
Publicado: (2009)