Cita APA (7a ed.)

ŞEKER, A. (2019). LEAN MANUFACTURING SYSTEM KANBAN, ONE PIECE FLOW AND U TYPE OF POSITIONING SYSTEMS. Fırat University.

Cita Chicago Style (17a ed.)

ŞEKER, Arzu. LEAN MANUFACTURING SYSTEM KANBAN, ONE PIECE FLOW AND U TYPE OF POSITIONING SYSTEMS. Fırat University, 2019.

Cita MLA (8a ed.)

ŞEKER, Arzu. LEAN MANUFACTURING SYSTEM KANBAN, ONE PIECE FLOW AND U TYPE OF POSITIONING SYSTEMS. Fırat University, 2019.

Precaución: Estas citas no son 100% exactas.