On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines

One of the essential issues of the benches’ development procedure is the choice of the method of seam development in the complex structure: joint development of rock and coal seams in one complex face or their separate excavation in blocks of 50-100 m in length. The decision of this question is conn...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Tyulenev Maxim, Markov Sergey, Litvin Oleg, Cehlár Michal, Litvin Yaroslav
Formato: article
Lenguaje:EN
FR
Publicado: EDP Sciences 2021
Materias:
Acceso en línea:https://doaj.org/article/38178b529fd04bb69b6fa767ce526b05
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:38178b529fd04bb69b6fa767ce526b05
record_format dspace
spelling oai:doaj.org-article:38178b529fd04bb69b6fa767ce526b052021-11-08T15:19:21ZOn the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines2267-124210.1051/e3sconf/202131501017https://doaj.org/article/38178b529fd04bb69b6fa767ce526b052021-01-01T00:00:00Zhttps://www.e3s-conferences.org/articles/e3sconf/pdf/2021/91/e3sconf_iims2021_01017.pdfhttps://doaj.org/toc/2267-1242One of the essential issues of the benches’ development procedure is the choice of the method of seam development in the complex structure: joint development of rock and coal seams in one complex face or their separate excavation in blocks of 50-100 m in length. The decision of this question is connected with the mode of mining works, represented by the schedule of stripping and winning works. The choice of one or another method is connected with operative-dispatching control of haul trucks delivery. When rock and coal are mined together in a complex face, overburden haul trucks should be supplied for loading rock and coal haul trucks for coal in turns. It is organizationally difficult to supply haul trucks of different purposes during the shift. It is necessary to proceed from the shift (daily) planning of haul trucks supply for specific faces. In addition, it is necessary to take into account that rock and coal faces are often located on opposite sides of the quarry pit. This article studies the issue of organizing the operation of excavation and loading equipment during the mining of the coal-bearing zone of the open pit in order to reduce the loss of output of haul trucks.Tyulenev MaximMarkov SergeyLitvin OlegCehlár MichalLitvin YaroslavEDP SciencesarticleEnvironmental sciencesGE1-350ENFRE3S Web of Conferences, Vol 315, p 01017 (2021)
institution DOAJ
collection DOAJ
language EN
FR
topic Environmental sciences
GE1-350
spellingShingle Environmental sciences
GE1-350
Tyulenev Maxim
Markov Sergey
Litvin Oleg
Cehlár Michal
Litvin Yaroslav
On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
description One of the essential issues of the benches’ development procedure is the choice of the method of seam development in the complex structure: joint development of rock and coal seams in one complex face or their separate excavation in blocks of 50-100 m in length. The decision of this question is connected with the mode of mining works, represented by the schedule of stripping and winning works. The choice of one or another method is connected with operative-dispatching control of haul trucks delivery. When rock and coal are mined together in a complex face, overburden haul trucks should be supplied for loading rock and coal haul trucks for coal in turns. It is organizationally difficult to supply haul trucks of different purposes during the shift. It is necessary to proceed from the shift (daily) planning of haul trucks supply for specific faces. In addition, it is necessary to take into account that rock and coal faces are often located on opposite sides of the quarry pit. This article studies the issue of organizing the operation of excavation and loading equipment during the mining of the coal-bearing zone of the open pit in order to reduce the loss of output of haul trucks.
format article
author Tyulenev Maxim
Markov Sergey
Litvin Oleg
Cehlár Michal
Litvin Yaroslav
author_facet Tyulenev Maxim
Markov Sergey
Litvin Oleg
Cehlár Michal
Litvin Yaroslav
author_sort Tyulenev Maxim
title On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
title_short On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
title_full On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
title_fullStr On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
title_full_unstemmed On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
title_sort on the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
publisher EDP Sciences
publishDate 2021
url https://doaj.org/article/38178b529fd04bb69b6fa767ce526b05
work_keys_str_mv AT tyulenevmaxim ontheorganizationofexcavationandtransportationequipmentinthecoalbearingzonesatopenpitmines
AT markovsergey ontheorganizationofexcavationandtransportationequipmentinthecoalbearingzonesatopenpitmines
AT litvinoleg ontheorganizationofexcavationandtransportationequipmentinthecoalbearingzonesatopenpitmines
AT cehlarmichal ontheorganizationofexcavationandtransportationequipmentinthecoalbearingzonesatopenpitmines
AT litvinyaroslav ontheorganizationofexcavationandtransportationequipmentinthecoalbearingzonesatopenpitmines
_version_ 1718441932393283584