On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
One of the essential issues of the benches’ development procedure is the choice of the method of seam development in the complex structure: joint development of rock and coal seams in one complex face or their separate excavation in blocks of 50-100 m in length. The decision of this question is conn...
Guardado en:
Autores principales: | Tyulenev Maxim, Markov Sergey, Litvin Oleg, Cehlár Michal, Litvin Yaroslav |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/38178b529fd04bb69b6fa767ce526b05 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Monitoring Mining Activities Using Sentinel-1A InSAR Coherence in Open-Pit Coal Mines
por: Lili Wang, et al.
Publicado: (2021) -
A study on movement characteristics and distribution law of dust particles in open-pit coal mine
por: Tong Wu, et al.
Publicado: (2021) -
Comparative assessment of the operation quality of shovel-truck systems at open-pit coal mines in the summer and transitional seasons
por: Voronov Anton, et al.
Publicado: (2021) -
Analysis of electric consumption: a study in the excavation area of the modern coal mine
por: Voronin Vyacheslav, et al.
Publicado: (2021) -
Simulation modeling of the power supply system of the coal mine excavation area with facts devices
por: Voronin Vyacheslav, et al.
Publicado: (2021)