GESTÃO DA OBRA PÚBLICA: UMA ANÁLISE COMPARATIVA DOS ADITIVOS DE VALOR E DE PRAZO ENTRE DUAS INSTITUIÇÕES FEDERAIS DE ENSINO
The public constructions promote a great movement of resources. Both the commercial media and academic literature report frequent changes during the execution phase of the construction contracts, mainly of value and duration, through the so-called contractual amendments. The objective of this articl...
Guardado en:
Autores principales: | Bruna dos Santos Corrêa, Heloisa Helena Oliveira Martins Shih |
---|---|
Formato: | article |
Lenguaje: | ES PT |
Publicado: |
Universidade Federal de Santa Catarina
2019
|
Materias: | |
Acceso en línea: | https://doi.org/10.5007/1983-4535.2019v12n3p130 https://doaj.org/article/399161e4fa394c338f28890098b46bac |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Evaluation of chañar seed cake from biodiesel production as a soil amendment
por: Santibáñez,C, et al.
Publicado: (2014) -
Effect of vermicompost and its mixtures with water treatment residuals on soil chemical properties and barley growth
por: Mahmoud,E.K, et al.
Publicado: (2012) -
Sorption and mobility of dimethenamid in a volcanic soil amended with liquid cow manure
por: Candia,O, et al.
Publicado: (2014) -
Soil carbon mineralization following biochar addition associated with external nitrogen
por: Zhao,Rudong, et al.
Publicado: (2015) -
A comparative study of phosphorus availability in an acidic soil and an alkaline soil amended with organic and inorganic phosphorus sources
por: Ara,Ismat, et al.
Publicado: (2018)