Robust Fuzzy-Stochastic Programming Model and Meta-Heuristic Algorithms for Dual-Resource Constrained Flexible Job-Shop Scheduling Problem Under Machine Breakdown
Resource scheduling, job sequencing, and assigning them to available resources are the most critical issues in manufacturing systems, such as flexible job-shop systems. In addition, scheduling uncertainties have attracted significant attention in this field. This study investigates the dual-resource...
Guardado en:
Autores principales: | Parham Soofi, Mehdi Yazdani, Maghsoud Amiri, Mohammad Amin Adibi |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
IEEE
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/3a0e363e64e74c7b8cbebe6c58d3f78b |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
DESIGN OF A HYPERHEURISTIC FOR PRODUCTION SCHEDULING IN JOB SHOP ENVIRONMENTS
por: Castrillón,Omar Danilo, et al.
Publicado: (2010) -
Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times
por: BongJoo Jeong, et al.
Publicado: (2021) -
Penjadwalan Produksi Job shop Mesin Majemuk Menggunakan Algoritma Non Delay untuk Meminimalkan Makespan
por: Adhie Tri Wahyudi, et al.
Publicado: (2021) -
Beberapa Metode pada Masalah Pemrograman Stokastik
por: Ihda Hasbiyati, et al.
Publicado: (2017) -
A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem
por: ZHAO Rui, et al.
Publicado: (2020)