Robust Fuzzy-Stochastic Programming Model and Meta-Heuristic Algorithms for Dual-Resource Constrained Flexible Job-Shop Scheduling Problem Under Machine Breakdown
Resource scheduling, job sequencing, and assigning them to available resources are the most critical issues in manufacturing systems, such as flexible job-shop systems. In addition, scheduling uncertainties have attracted significant attention in this field. This study investigates the dual-resource...
Enregistré dans:
Auteurs principaux: | Parham Soofi, Mehdi Yazdani, Maghsoud Amiri, Mohammad Amin Adibi |
---|---|
Format: | article |
Langue: | EN |
Publié: |
IEEE
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/3a0e363e64e74c7b8cbebe6c58d3f78b |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
DESIGN OF A HYPERHEURISTIC FOR PRODUCTION SCHEDULING IN JOB SHOP ENVIRONMENTS
par: Castrillón,Omar Danilo, et autres
Publié: (2010) -
Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times
par: BongJoo Jeong, et autres
Publié: (2021) -
Penjadwalan Produksi Job shop Mesin Majemuk Menggunakan Algoritma Non Delay untuk Meminimalkan Makespan
par: Adhie Tri Wahyudi, et autres
Publié: (2021) -
Beberapa Metode pada Masalah Pemrograman Stokastik
par: Ihda Hasbiyati, et autres
Publié: (2017) -
A Discrete Sine Optimization Algorithm for No-Idle Flow-Shop Scheduling Problem
par: ZHAO Rui, et autres
Publié: (2020)