Integrated risk management: a Petrobras application in offshore well construction safety to minimize critical emergency disconnections
Abstract In order to avoid mistakes and to save a great deal of time in analysis, an innovative methodology was developed that can analyze the well operations and rig characteristics involved to define the best emergency disconnect sequence (EDS) available. A solution was developed based on the char...
Guardado en:
Autores principales: | Claudio Benevenuto de Campos Lima, Pedro Esteves Aranha, Jose Francisco Tebaldi de Castro, Gilson Brito Alves Lima, Augusto Borella Hougaz, Felipe de Souza Terra |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
KeAi Communications Co., Ltd.
2018
|
Materias: | |
Acceso en línea: | https://doaj.org/article/3b87de818fa941e9945fe811297eac11 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
A proposed NMR solution for multi-phase flow fluid detection
por: Jun-Feng Shi, et al.
Publicado: (2019) -
A simulation study comparing the Texas two-step and the multistage consecutive fracturing method
por: Wan Cheng, et al.
Publicado: (2019) -
The performance of stochastic designs in wellbore drilling operations
por: Kenneth Imo-Imo Eshiet, et al.
Publicado: (2018) -
Cognitive Component in the Structure of Children’s Subjective Well-Being
por: Bruk Zh.Yu., et al.
Publicado: (2021) -
Effect of zona pellucida removal on early development of in vitro produced bovine embryos
por: Velásquez,AE, et al.
Publicado: (2013)