Selecting the Optimal Building System Using Multiple Criteria Decision Making Emphasising on Three Methods of TOPSIS , SAW, AHP
Nowadays, various factors complicate the decision making process and the need to make decisions that consider all the factors in question, they are more than ever before. The internal and external researchers, have shown interest in the multi-criteria decision making. In our study, the method includ...
Guardado en:
Autores principales: | Alireza Rezaiean, Seyed Amirhosein Hoseini |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
Iranian Society of Structrual Engineering (ISSE)
2015
|
Materias: | |
Acceso en línea: | https://doaj.org/article/401366b91df84cd3a960f8e4d56a764b |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Evaluating and prioritizing the risks of BOT projects using structural equations and integrated model of fuzzy AHP and fuzzy TOPSIS
por: Seyed Morteza Hatefi, et al.
Publicado: (2019) -
Prioritizing of repair and rehabilitation for concrete bridges of road network in Khorasan Razavi province, using analytical hierarchy process (AHP)
por: Soheil Ghareh, et al.
Publicado: (2019) -
MULTI-CRITERIA DECISION APPROACH WITH AHP AND IF-TOPSIS METHODS FOR R&D PROJECT SELECTION PROCESS
por: EZGİ GÜLER, et al.
Publicado: (2019) -
Implementation of Value Engineering in the Body of Earth Dams: A Case Study of Sikan Dam, Daree- shahr, Ilam
por: Armin Monirabasi, et al.
Publicado: (2015) -
A maturity evaluation model for implementing agile management in Iranian building companies with respect to identifications of its challenges
por: Hamidreza Abbasianjahromi, et al.
Publicado: (2017)