Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows
In order to improve the sorting efficiency of automatic guided vehicle (AGV) in the logistics sorting center, an optimized model was proposed considering the characteristics of power consumption and charging demand in the sorting process of electric-driven AGVs. On the basis of considering of the AG...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | ZH |
Publicado: |
Hebei University of Science and Technology
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/414b4706082d477186720b48dfe05d33 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:414b4706082d477186720b48dfe05d33 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:414b4706082d477186720b48dfe05d332021-11-23T07:16:39ZOptimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows1008-154210.7535/hbkd.2021yx02001https://doaj.org/article/414b4706082d477186720b48dfe05d332021-04-01T00:00:00Zhttp://xuebao.hebust.edu.cn/hbkjdx/ch/reader/create_pdf.aspx?file_no=b202102001&flag=1&journal_https://doaj.org/toc/1008-1542In order to improve the sorting efficiency of automatic guided vehicle (AGV) in the logistics sorting center, an optimized model was proposed considering the characteristics of power consumption and charging demand in the sorting process of electric-driven AGVs. On the basis of considering of the AGVs’ remaining power and package delivery time window, a mixed integer programming (MIP) model with the minimization of the sorting operation cycle and a corresponding constrained programming (CP) model were formulated. In CP model, the interval variables were used to describe the performance of tasks and the change of electric quantity was recorded by using cumulative function. The computational results show that the CP model has better performance compared with the MIP model.Adopting mixed integer programming and constrained programming to formulate the AGV scheduling model can effectively improve the sorting efficiency, reduce the operating cost of enterprises, and provide an alternative solution for the AGV scheduling problem with more constraints.Xiangling CHENPeng GUOKun WENXia PEIHebei University of Science and Technologyarticlelogistics system management; multi-agv scheduling; charging demand; time window; constrained programmingTechnologyTZHJournal of Hebei University of Science and Technology, Vol 42, Iss 2, Pp 91-100 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
ZH |
topic |
logistics system management; multi-agv scheduling; charging demand; time window; constrained programming Technology T |
spellingShingle |
logistics system management; multi-agv scheduling; charging demand; time window; constrained programming Technology T Xiangling CHEN Peng GUO Kun WEN Xia PEI Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
description |
In order to improve the sorting efficiency of automatic guided vehicle (AGV) in the logistics sorting center, an optimized model was proposed considering the characteristics of power consumption and charging demand in the sorting process of electric-driven AGVs. On the basis of considering of the AGVs’ remaining power and package delivery time window, a mixed integer programming (MIP) model with the minimization of the sorting operation cycle and a corresponding constrained programming (CP) model were formulated. In CP model, the interval variables were used to describe the performance of tasks and the change of electric quantity was recorded by using cumulative function. The computational results show that the CP model has better performance compared with the MIP model.Adopting mixed integer programming and constrained programming to formulate the AGV scheduling model can effectively improve the sorting efficiency, reduce the operating cost of enterprises, and provide an alternative solution for the AGV scheduling problem with more constraints. |
format |
article |
author |
Xiangling CHEN Peng GUO Kun WEN Xia PEI |
author_facet |
Xiangling CHEN Peng GUO Kun WEN Xia PEI |
author_sort |
Xiangling CHEN |
title |
Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
title_short |
Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
title_full |
Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
title_fullStr |
Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
title_full_unstemmed |
Optimized mathematical models for multi-AGV scheduling problem with charging requirements and time windows |
title_sort |
optimized mathematical models for multi-agv scheduling problem with charging requirements and time windows |
publisher |
Hebei University of Science and Technology |
publishDate |
2021 |
url |
https://doaj.org/article/414b4706082d477186720b48dfe05d33 |
work_keys_str_mv |
AT xianglingchen optimizedmathematicalmodelsformultiagvschedulingproblemwithchargingrequirementsandtimewindows AT pengguo optimizedmathematicalmodelsformultiagvschedulingproblemwithchargingrequirementsandtimewindows AT kunwen optimizedmathematicalmodelsformultiagvschedulingproblemwithchargingrequirementsandtimewindows AT xiapei optimizedmathematicalmodelsformultiagvschedulingproblemwithchargingrequirementsandtimewindows |
_version_ |
1718416822145908736 |