Carbamazepine removal from low-strength municipal wastewater using a combined UASB-MBR treatment system
An Upflow Anaerobic Sludge Blanket reactor combined with a two-stage membrane bioreactor were operated for 193 days in order to evaluate the biological removal of carbamazepine (CBZ) from low-strength municipal wastewater. The system worked in three different organic load stages (0.7 ± 0.1 kg COD·m−...
Saved in:
Main Authors: | , , |
---|---|
Format: | article |
Language: | EN |
Published: |
IWA Publishing
2021
|
Subjects: | |
Online Access: | https://doaj.org/article/4561ed3d06e8409ab4aa9f04ca1d2b8b |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!