Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling

This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PMT was created. To ensure data compatibility betwee...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Borna Dasović, Uroš Klanšek
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
Acceso en línea:https://doaj.org/article/47aae3769a00467a9f225b481578771e
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:47aae3769a00467a9f225b481578771e
record_format dspace
spelling oai:doaj.org-article:47aae3769a00467a9f225b481578771e2021-11-11T19:46:49ZIntegration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling10.3390/su1321121732071-1050https://doaj.org/article/47aae3769a00467a9f225b481578771e2021-11-01T00:00:00Zhttps://www.mdpi.com/2071-1050/13/21/12173https://doaj.org/toc/2071-1050This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PMT was created. To ensure data compatibility between the optimization system and PMT and to automate the process of obtaining a cost-optimal schedule, a data transformation tool (DTT) was developed within a spreadsheet application. The suggested system can determine: (i) an optimal project schedule with associated network diagram and Gantt chart in continuous or discrete time units; (ii) optimal critical and non-critical activities, including their early start, late start, early finish, late finish along with total and free slack times; and (iii) minimum total project cost along with the allocation of direct and indirect costs. The system provides functionalities such as: (i) MINLP can be updated, and schedules can be re-optimized; (ii) the optimal schedule can be saved as a baseline to track changes; (iii) different optimization algorithms can be engaged whereby switching between them does not require model changes; (iv) PMT can be used to track task completion in the optimized schedule; (v) calendar settings can be changed; and (vi) visual reports can be generated to support efficient project management. Results of cost-optimal project scheduling are given in a conventional PMT environment, which raises the possibility that the proposed system will be more widely used in practice. Integration of MINLP and PMT allows each software to be used for what it was initially designed. Their combination leads to additional information and features of optimized construction schedules that would be significantly more difficult to achieve if used separately. Application examples are given in the paper to show the advantages of the proposed approach.Borna DasovićUroš KlanšekMDPI AGarticlesustainable schedulingsystems integrationproject management toolscost optimizationmixed-integer nonlinear programingMINLPEnvironmental effects of industries and plantsTD194-195Renewable energy sourcesTJ807-830Environmental sciencesGE1-350ENSustainability, Vol 13, Iss 12173, p 12173 (2021)
institution DOAJ
collection DOAJ
language EN
topic sustainable scheduling
systems integration
project management tools
cost optimization
mixed-integer nonlinear programing
MINLP
Environmental effects of industries and plants
TD194-195
Renewable energy sources
TJ807-830
Environmental sciences
GE1-350
spellingShingle sustainable scheduling
systems integration
project management tools
cost optimization
mixed-integer nonlinear programing
MINLP
Environmental effects of industries and plants
TD194-195
Renewable energy sources
TJ807-830
Environmental sciences
GE1-350
Borna Dasović
Uroš Klanšek
Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
description This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PMT was created. To ensure data compatibility between the optimization system and PMT and to automate the process of obtaining a cost-optimal schedule, a data transformation tool (DTT) was developed within a spreadsheet application. The suggested system can determine: (i) an optimal project schedule with associated network diagram and Gantt chart in continuous or discrete time units; (ii) optimal critical and non-critical activities, including their early start, late start, early finish, late finish along with total and free slack times; and (iii) minimum total project cost along with the allocation of direct and indirect costs. The system provides functionalities such as: (i) MINLP can be updated, and schedules can be re-optimized; (ii) the optimal schedule can be saved as a baseline to track changes; (iii) different optimization algorithms can be engaged whereby switching between them does not require model changes; (iv) PMT can be used to track task completion in the optimized schedule; (v) calendar settings can be changed; and (vi) visual reports can be generated to support efficient project management. Results of cost-optimal project scheduling are given in a conventional PMT environment, which raises the possibility that the proposed system will be more widely used in practice. Integration of MINLP and PMT allows each software to be used for what it was initially designed. Their combination leads to additional information and features of optimized construction schedules that would be significantly more difficult to achieve if used separately. Application examples are given in the paper to show the advantages of the proposed approach.
format article
author Borna Dasović
Uroš Klanšek
author_facet Borna Dasović
Uroš Klanšek
author_sort Borna Dasović
title Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
title_short Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
title_full Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
title_fullStr Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
title_full_unstemmed Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling
title_sort integration of mixed-integer nonlinear program and project management tool to support sustainable cost-optimal construction scheduling
publisher MDPI AG
publishDate 2021
url https://doaj.org/article/47aae3769a00467a9f225b481578771e
work_keys_str_mv AT bornadasovic integrationofmixedintegernonlinearprogramandprojectmanagementtooltosupportsustainablecostoptimalconstructionscheduling
AT urosklansek integrationofmixedintegernonlinearprogramandprojectmanagementtooltosupportsustainablecostoptimalconstructionscheduling
_version_ 1718431405667516416