The Punatsangchhu-I dam landslide illuminated by InSAR multitemporal analyses
Abstract We use multitemporal analyses based on Synthetic Aperture Radar differential interferometry (DInSAR) to study the slope adjacent to the large Punatsangchhu-I hydropower plant, a concrete gravity dam under construction in Bhutan since 2009. Several slope failures affected the site since 2013...
Enregistré dans:
Auteurs principaux: | Benedetta Dini, Andrea Manconi, Simon Loew, Jamyang Chophel |
---|---|
Format: | article |
Langue: | EN |
Publié: |
Nature Portfolio
2020
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/4cae0fd0b26a4717982f62737154178f |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Multitemporal and Multisensor InSAR Analysis for Ground Displacement Field Assessment at Ischia Volcanic Island (Italy)
par: Lisa Beccaro, et autres
Publié: (2021) -
A new strategy to map landslides with a generalized convolutional neural network
par: Nikhil Prakash, et autres
Publié: (2021) -
Accuracy Verification and Correction of D-InSAR and SBAS-InSAR in Monitoring Mining Surface Subsidence
par: Yang Chen, et autres
Publié: (2021) -
Mapping and Characterizing Displacements of Landslides with InSAR and Airborne LiDAR Technologies: A Case Study of Danba County, Southwest China
par: Qiang Xu, et autres
Publié: (2021) -
Cloud model-based evaluation of landslide dam development feasibility.
par: Dengze Luo, et autres
Publié: (2021)