Geotechnical profiling of a surface mine waste dump using 2D Wenner–Schlumberger configuration
Mapping the subsurface in slope stability analysis of disposal areas is difficult, especially the disposal layering materials that are assumed to be homogeneous instead of their real conditions. Moreover, the hoarding activities on high slope form layers based on the nature of the rock mechanics wit...
Enregistré dans:
Auteur principal: | Supandi Supandi |
---|---|
Format: | article |
Langue: | EN |
Publié: |
De Gruyter
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/4ed63aa35e3f4d36b38bc3042470b131 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Comparative application of photogrammetry, handmapping and android smartphone for geotechnical mapping and slope stability analysis
par: Matsimbe Jabulani
Publié: (2021) -
Hydrogeology Response to the Coordinated Mining of Coal and Uranium: A Transparent Physical Experiment
par: Tong Zhang, et autres
Publié: (2021) -
Study on Damage Constitutive Model of High-Concentration Cemented Backfill in Coal Mine
par: Baogui Yang, et autres
Publié: (2021) -
Optimization of Barrier Pillar Design in Longwall Mining with Top Coal Caving in Spontaneous Combustion Coal Seam
par: Qiang Fu, et autres
Publié: (2021) -
Characteristics of Stratum Structure and Fracture Evolution in Stratified Mining of Shallow Buried High-Gas-Thick Coal Seam by Similarity Simulation
par: Qin Guangpeng, et autres
Publié: (2021)