Primary crusher site selection in open pit mines: Case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine design process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location for primary crusher in order to support the expa...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | EN SR |
Publicado: |
Faculty of Mining and Geology, Belgrade
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/5018cf1480a94bb2b74dfbcbbfa31b1e |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:5018cf1480a94bb2b74dfbcbbfa31b1e |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:5018cf1480a94bb2b74dfbcbbfa31b1e2021-12-05T21:29:29ZPrimary crusher site selection in open pit mines: Case study in Sungun copper mine0354-29042560-333710.5937/podrad2138015Nhttps://doaj.org/article/5018cf1480a94bb2b74dfbcbbfa31b1e2021-01-01T00:00:00Zhttps://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2021/0354-29042138015N.pdfhttps://doaj.org/toc/0354-2904https://doaj.org/toc/2560-3337Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine design process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location for primary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, Sungun started the studies followed with an expansion plan with the goal to increase the capacity from 14 to 28 Mt/Year within the next 8 years. In this paper, 14 effective parameters for finding the best location for a new crusher in five possible options were considered. The options were evaluated based on weighted linear combination method. The results show that the location in South East part of the open pit is the best option for locating of the new crusher. Finally, based on the economic parameters and copper price forecasts, pit optimization and sensitive analysis are applied. Results show that in the worst case, just 0.17 % of ore reserve is affected by the selected area and the minable reserve can cover 78 years of operation.Nasirinezhad AliStevanović DejanIgnjatović DraganRahmanpour MehdiFaculty of Mining and Geology, Belgradearticlesite selectionmulti criteria decision makingsensitivity analysissungun copper mineGeologyQE1-996.5ENSRPodzemni Radovi, Vol 2021, Iss 38, Pp 15-25 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN SR |
topic |
site selection multi criteria decision making sensitivity analysis sungun copper mine Geology QE1-996.5 |
spellingShingle |
site selection multi criteria decision making sensitivity analysis sungun copper mine Geology QE1-996.5 Nasirinezhad Ali Stevanović Dejan Ignjatović Dragan Rahmanpour Mehdi Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
description |
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine design process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location for primary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, Sungun started the studies followed with an expansion plan with the goal to increase the capacity from 14 to 28 Mt/Year within the next 8 years. In this paper, 14 effective parameters for finding the best location for a new crusher in five possible options were considered. The options were evaluated based on weighted linear combination method. The results show that the location in South East part of the open pit is the best option for locating of the new crusher. Finally, based on the economic parameters and copper price forecasts, pit optimization and sensitive analysis are applied. Results show that in the worst case, just 0.17 % of ore reserve is affected by the selected area and the minable reserve can cover 78 years of operation. |
format |
article |
author |
Nasirinezhad Ali Stevanović Dejan Ignjatović Dragan Rahmanpour Mehdi |
author_facet |
Nasirinezhad Ali Stevanović Dejan Ignjatović Dragan Rahmanpour Mehdi |
author_sort |
Nasirinezhad Ali |
title |
Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
title_short |
Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
title_full |
Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
title_fullStr |
Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
title_full_unstemmed |
Primary crusher site selection in open pit mines: Case study in Sungun copper mine |
title_sort |
primary crusher site selection in open pit mines: case study in sungun copper mine |
publisher |
Faculty of Mining and Geology, Belgrade |
publishDate |
2021 |
url |
https://doaj.org/article/5018cf1480a94bb2b74dfbcbbfa31b1e |
work_keys_str_mv |
AT nasirinezhadali primarycrushersiteselectioninopenpitminescasestudyinsunguncoppermine AT stevanovicdejan primarycrushersiteselectioninopenpitminescasestudyinsunguncoppermine AT ignjatovicdragan primarycrushersiteselectioninopenpitminescasestudyinsunguncoppermine AT rahmanpourmehdi primarycrushersiteselectioninopenpitminescasestudyinsunguncoppermine |
_version_ |
1718370942212636672 |