A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor

As one of the tasks of the Comprehensive Research Facility for Fusion Technology (CRAFT), a High Heat Flux (HHF) testing device will be built to test the blanket and divertor of Chinese Fusion Engineering Testing Reactor (CFETR). The water loop is a key system of the HHF testing device. The main obj...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Xiaoman Cheng, Zihan Liu, Songlin Liu, Changhong Peng, Wenjia Wang, Qixin Ling
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
T
Acceso en línea:https://doaj.org/article/536a211481aa4ccd850eedd67e387bac
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:536a211481aa4ccd850eedd67e387bac
record_format dspace
spelling oai:doaj.org-article:536a211481aa4ccd850eedd67e387bac2021-11-11T16:04:25ZA Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor10.3390/en142173541996-1073https://doaj.org/article/536a211481aa4ccd850eedd67e387bac2021-11-01T00:00:00Zhttps://www.mdpi.com/1996-1073/14/21/7354https://doaj.org/toc/1996-1073As one of the tasks of the Comprehensive Research Facility for Fusion Technology (CRAFT), a High Heat Flux (HHF) testing device will be built to test the blanket and divertor of Chinese Fusion Engineering Testing Reactor (CFETR). The water loop is a key system of the HHF testing device. The main objective of the water loop is to provide deionized water at specific temperature, pressure, and flow rate for different testing experiments of the water-cooled blanket and water-cooled divertor components. The design of the water loop has been through three major steps. Firstly, the water cooled blanket and divertor were designed and analyzed, in detail, for CFETR. Secondly, thermal hydraulic features of the prototypes were abstracted from the analyses results. Then, the experiment plan was made so that the preliminary design of the water loop was carried out. The third step was the engineering design, which was conducted through cooperation with an industrial enterprise with certifications. At present, the water loop is ready for fabrication and construction. The water loop will be completed, for commissioning operation, by August 2022, as scheduled. After that, the experiments will be carried out step by step and provide solid technical base to CFETR.Xiaoman ChengZihan LiuSonglin LiuChanghong PengWenjia WangQixin LingMDPI AGarticleCFETRCRAFTblanket and divertorexperiment planwater loop designTechnologyTENEnergies, Vol 14, Iss 7354, p 7354 (2021)
institution DOAJ
collection DOAJ
language EN
topic CFETR
CRAFT
blanket and divertor
experiment plan
water loop design
Technology
T
spellingShingle CFETR
CRAFT
blanket and divertor
experiment plan
water loop design
Technology
T
Xiaoman Cheng
Zihan Liu
Songlin Liu
Changhong Peng
Wenjia Wang
Qixin Ling
A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
description As one of the tasks of the Comprehensive Research Facility for Fusion Technology (CRAFT), a High Heat Flux (HHF) testing device will be built to test the blanket and divertor of Chinese Fusion Engineering Testing Reactor (CFETR). The water loop is a key system of the HHF testing device. The main objective of the water loop is to provide deionized water at specific temperature, pressure, and flow rate for different testing experiments of the water-cooled blanket and water-cooled divertor components. The design of the water loop has been through three major steps. Firstly, the water cooled blanket and divertor were designed and analyzed, in detail, for CFETR. Secondly, thermal hydraulic features of the prototypes were abstracted from the analyses results. Then, the experiment plan was made so that the preliminary design of the water loop was carried out. The third step was the engineering design, which was conducted through cooperation with an industrial enterprise with certifications. At present, the water loop is ready for fabrication and construction. The water loop will be completed, for commissioning operation, by August 2022, as scheduled. After that, the experiments will be carried out step by step and provide solid technical base to CFETR.
format article
author Xiaoman Cheng
Zihan Liu
Songlin Liu
Changhong Peng
Wenjia Wang
Qixin Ling
author_facet Xiaoman Cheng
Zihan Liu
Songlin Liu
Changhong Peng
Wenjia Wang
Qixin Ling
author_sort Xiaoman Cheng
title A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
title_short A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
title_full A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
title_fullStr A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
title_full_unstemmed A Water Loop Design for the CRAFT Project towards the Testing of CFETR Water-Cooled Blanket and Divertor
title_sort water loop design for the craft project towards the testing of cfetr water-cooled blanket and divertor
publisher MDPI AG
publishDate 2021
url https://doaj.org/article/536a211481aa4ccd850eedd67e387bac
work_keys_str_mv AT xiaomancheng awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT zihanliu awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT songlinliu awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT changhongpeng awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT wenjiawang awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT qixinling awaterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT xiaomancheng waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT zihanliu waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT songlinliu waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT changhongpeng waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT wenjiawang waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
AT qixinling waterloopdesignforthecraftprojecttowardsthetestingofcfetrwatercooledblanketanddivertor
_version_ 1718432412952690688