Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network
Under the background of rapid economic development and the continuous expansion of city size, people’s travel is deeply troubled by the problem of urban traffic congestion. Subway is an effective way to relieve traffic pressure and plays an important role in its use. In the process of building the c...
Guardado en:
Autores principales: | , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Hindawi Limited
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/59e6cfe9f13146e8bab1d51627a1b801 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:59e6cfe9f13146e8bab1d51627a1b801 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:59e6cfe9f13146e8bab1d51627a1b8012021-11-08T02:35:40ZSubway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network1875-919X10.1155/2021/4678744https://doaj.org/article/59e6cfe9f13146e8bab1d51627a1b8012021-01-01T00:00:00Zhttp://dx.doi.org/10.1155/2021/4678744https://doaj.org/toc/1875-919XUnder the background of rapid economic development and the continuous expansion of city size, people’s travel is deeply troubled by the problem of urban traffic congestion. Subway is an effective way to relieve traffic pressure and plays an important role in its use. In the process of building the city subway, the excavation of the underground tunnel is the most critical. However, the excavation of the tunnel will inevitably disturb the nearby soil, change the stratum stress conditions, and make the stress distribution uneven. If the surface settlement is too large, it will not only affect the normal construction of the tunnel but also cause damage to the surrounding buildings (structures), roads, underground pipelines, and so on, resulting in very serious malignant consequences. In this study, Cuobuling Station is taken as a case study. First, the construction status of the subway tunnel in the station is analyzed, and then the monitoring results are analyzed. According to the cross-section settlement law, the numerical simulation and neural network are used to build a model, calculate the numerical simulation results, and carry out a risk assessment of regression model. Finally, combined with the tunnel construction situation of the station, according to the risk assessment results, the concrete measures are put forward to deal with the subway tunnel construction settlement problem.Qiangqiang MaWentao LiYongjun ZhangHindawi LimitedarticleComputer softwareQA76.75-76.765ENScientific Programming, Vol 2021 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
Computer software QA76.75-76.765 |
spellingShingle |
Computer software QA76.75-76.765 Qiangqiang Ma Wentao Li Yongjun Zhang Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
description |
Under the background of rapid economic development and the continuous expansion of city size, people’s travel is deeply troubled by the problem of urban traffic congestion. Subway is an effective way to relieve traffic pressure and plays an important role in its use. In the process of building the city subway, the excavation of the underground tunnel is the most critical. However, the excavation of the tunnel will inevitably disturb the nearby soil, change the stratum stress conditions, and make the stress distribution uneven. If the surface settlement is too large, it will not only affect the normal construction of the tunnel but also cause damage to the surrounding buildings (structures), roads, underground pipelines, and so on, resulting in very serious malignant consequences. In this study, Cuobuling Station is taken as a case study. First, the construction status of the subway tunnel in the station is analyzed, and then the monitoring results are analyzed. According to the cross-section settlement law, the numerical simulation and neural network are used to build a model, calculate the numerical simulation results, and carry out a risk assessment of regression model. Finally, combined with the tunnel construction situation of the station, according to the risk assessment results, the concrete measures are put forward to deal with the subway tunnel construction settlement problem. |
format |
article |
author |
Qiangqiang Ma Wentao Li Yongjun Zhang |
author_facet |
Qiangqiang Ma Wentao Li Yongjun Zhang |
author_sort |
Qiangqiang Ma |
title |
Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
title_short |
Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
title_full |
Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
title_fullStr |
Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
title_full_unstemmed |
Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network |
title_sort |
subway tunnel construction settlement analysis based on the combination of numerical simulation and neural network |
publisher |
Hindawi Limited |
publishDate |
2021 |
url |
https://doaj.org/article/59e6cfe9f13146e8bab1d51627a1b801 |
work_keys_str_mv |
AT qiangqiangma subwaytunnelconstructionsettlementanalysisbasedonthecombinationofnumericalsimulationandneuralnetwork AT wentaoli subwaytunnelconstructionsettlementanalysisbasedonthecombinationofnumericalsimulationandneuralnetwork AT yongjunzhang subwaytunnelconstructionsettlementanalysisbasedonthecombinationofnumericalsimulationandneuralnetwork |
_version_ |
1718443187233619968 |