On possible changes in the calculation of parameters of transport technology of open pit mining with the use of autonomous heavy platforms
Reducing the costs of the transport component, reaching up to 50% or more of the total cost of the mined coal, is an urgent task that does not require additional confirmation. Since the development of measures to improve the purely technical indicators of motor transport at open-pit mines is beyond...
Guardado en:
Autor principal: | Stenin Dmitry |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/5ad127f5ebec4bcda88ac23b59bb2d9c |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Infrastructural requirements for the implementation of autonomous trucks in open-pit mines
por: Benlaajili Sanaa, et al.
Publicado: (2021) -
The economic assessment of heavy dump trucks energy distribution while in operation at Kuzbass open-pit mines
por: Kuznetsov Ilya, et al.
Publicado: (2021) -
On the organization of excavation and transportation equipment in the coal-bearing zones at open pit mines
por: Tyulenev Maxim, et al.
Publicado: (2021) -
Study on Blasting Technology for Open-Pit Layering of Complex Mine Adjacent to High and Steep Slope
por: Menglai Wang, et al.
Publicado: (2021) -
Primary crusher site selection in open pit mines: Case study in Sungun copper mine
por: Nasirinezhad Ali, et al.
Publicado: (2021)