Surface and subsurface engineering geological mapping for empirical designs of excavation method and support system of Tunnel 6 of Jakarta-Bandung high speed railway, Indonesia
Empirical design of support system at the Tunnel 6 of the Jakarta – Bandung high-speed railway was based on the Basic Quality (BQ) system, which had not been adopted in Indonesia. This research was carried out to better understand the rock mass quality at the tunnel construction site by comparing ro...
Enregistré dans:
Auteurs principaux: | Malda Octavika, Indrawan I Gde Budi, Akmaluddin Akmaluddin |
---|---|
Format: | article |
Langue: | EN FR |
Publié: |
EDP Sciences
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/64bf5f8087b14257a501dbc24d8d675a |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Engineering geological mapping for empirical design evaluation of Tunnel 10 of Jakarta - Bandung high-speed railway, Indonesia
par: Herdiana Hanifah Hilda, et autres
Publié: (2021) -
Engineering geological studies for empirical design of tunnel 7 of Jakarta - Bandung high-speed railway, Indonesia
par: Pramono Riski, et autres
Publié: (2021) -
Empirical analyses of excavation method and tunnel support system based on engineering geology of Tunnel No.8 at Jakarta – Bandung high-speed railway, West Bandung, Province of West Java, Indonesia
par: Ayu Oktarina Ika Medika, et autres
Publié: (2021) -
Engineering geological investigations for evaluation of excavation method and stand-up time of the DK99-DK100 Jakarta – Bandung high-speed railway tunnel, Indonesia
par: Ali Linda, et autres
Publié: (2021) - World tunnelling and subsurface excavation