Surface and subsurface engineering geological mapping for empirical designs of excavation method and support system of Tunnel 6 of Jakarta-Bandung high speed railway, Indonesia
Empirical design of support system at the Tunnel 6 of the Jakarta – Bandung high-speed railway was based on the Basic Quality (BQ) system, which had not been adopted in Indonesia. This research was carried out to better understand the rock mass quality at the tunnel construction site by comparing ro...
Saved in:
Main Authors: | Malda Octavika, Indrawan I Gde Budi, Akmaluddin Akmaluddin |
---|---|
Format: | article |
Language: | EN FR |
Published: |
EDP Sciences
2021
|
Subjects: | |
Online Access: | https://doaj.org/article/64bf5f8087b14257a501dbc24d8d675a |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Engineering geological mapping for empirical design evaluation of Tunnel 10 of Jakarta - Bandung high-speed railway, Indonesia
by: Herdiana Hanifah Hilda, et al.
Published: (2021) -
Engineering geological studies for empirical design of tunnel 7 of Jakarta - Bandung high-speed railway, Indonesia
by: Pramono Riski, et al.
Published: (2021) -
Empirical analyses of excavation method and tunnel support system based on engineering geology of Tunnel No.8 at Jakarta – Bandung high-speed railway, West Bandung, Province of West Java, Indonesia
by: Ayu Oktarina Ika Medika, et al.
Published: (2021) -
Engineering geological investigations for evaluation of excavation method and stand-up time of the DK99-DK100 Jakarta – Bandung high-speed railway tunnel, Indonesia
by: Ali Linda, et al.
Published: (2021) - World tunnelling and subsurface excavation