EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE
Background: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at...
Guardado en:
Autores principales: | Desi Nuraini, Doni Hikmat Ramdhan |
---|---|
Formato: | article |
Lenguaje: | ID |
Publicado: |
Universitas Airlangga
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/64f2b821fa894f22adc403c7269b2954 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
The problem of determining the eligibility of the electronic contractor through modern means of communication
por: رقاني عبد المالك, et al.
Publicado: (2021) -
Fatigue Stress Estimation for Submerged and Sub-Soil Welds of Offshore Wind Turbines on Monopiles Using Modal Expansion
por: Maximilian Henkel, et al.
Publicado: (2021) -
Fatigue as a long-term risk factor for limitations in instrumental activities of daily living and/or mobility performance in older adults after 10 years
por: Mueller-Schotte S, et al.
Publicado: (2016) -
ESPECIES DE TRIPS (INSECTA: THYSANOPTERA: THRIPIDAE) EN LAS FLORES DE ORNAMENTALES
por: Carrizo,Paola, et al.
Publicado: (2008) -
Identification of Health and Safety Prequalification Criteria for Contractor Selection in Construction Projects: A Systematic Review
por: Nadeera Abdul Razak, et al.
Publicado: (2021)