A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep

The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Fei Zhou, Tangdai Xia, Bingqi Yu, Fan Xia, Fan Yu
Formato: article
Lenguaje:EN
Publicado: Hindawi-Wiley 2021
Materias:
Acceso en línea:https://doaj.org/article/67c2b9d468554cd99b246cc095b2c505
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:67c2b9d468554cd99b246cc095b2c505
record_format dspace
spelling oai:doaj.org-article:67c2b9d468554cd99b246cc095b2c5052021-11-15T01:19:09ZA Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep1468-812310.1155/2021/4029439https://doaj.org/article/67c2b9d468554cd99b246cc095b2c5052021-01-01T00:00:00Zhttp://dx.doi.org/10.1155/2021/4029439https://doaj.org/toc/1468-8123The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is aimed at generalizing a new design method for controlling highway postconstruction settlement by replacing subgrade with expanded polystyrene (EPS). In the new method, the creep coefficient can be calculated based on the Yin-Graham EVP model. Thus, the relationship between the overloading ratio (OLR) and overconsolidation ratio (OCR) is obtained. The new method involves five steps: (a) determine the creep coefficient based on the relationship between the creep coefficient and over consolidation ratio, (b) divide the ground into a suitable number of sublayers, (c) select groups of different overloading ratios and then calculate the average values of the additional stress and overconsolidation ratio for each sublayer under different OLRs, (d) calculate the postconstruction settlement under different OLRs, and (e) determine the replacement capacity for different sections. This method can be used for quantitative design according to different requirements of postconstruction settlement of foundation. Taking Huzhou Avenue as an example, the case study illustrates the calculation process of the new method in detail.Fei ZhouTangdai XiaBingqi YuFan XiaFan YuHindawi-WileyarticleGeologyQE1-996.5ENGeofluids, Vol 2021 (2021)
institution DOAJ
collection DOAJ
language EN
topic Geology
QE1-996.5
spellingShingle Geology
QE1-996.5
Fei Zhou
Tangdai Xia
Bingqi Yu
Fan Xia
Fan Yu
A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
description The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is aimed at generalizing a new design method for controlling highway postconstruction settlement by replacing subgrade with expanded polystyrene (EPS). In the new method, the creep coefficient can be calculated based on the Yin-Graham EVP model. Thus, the relationship between the overloading ratio (OLR) and overconsolidation ratio (OCR) is obtained. The new method involves five steps: (a) determine the creep coefficient based on the relationship between the creep coefficient and over consolidation ratio, (b) divide the ground into a suitable number of sublayers, (c) select groups of different overloading ratios and then calculate the average values of the additional stress and overconsolidation ratio for each sublayer under different OLRs, (d) calculate the postconstruction settlement under different OLRs, and (e) determine the replacement capacity for different sections. This method can be used for quantitative design according to different requirements of postconstruction settlement of foundation. Taking Huzhou Avenue as an example, the case study illustrates the calculation process of the new method in detail.
format article
author Fei Zhou
Tangdai Xia
Bingqi Yu
Fan Xia
Fan Yu
author_facet Fei Zhou
Tangdai Xia
Bingqi Yu
Fan Xia
Fan Yu
author_sort Fei Zhou
title A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
title_short A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
title_full A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
title_fullStr A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
title_full_unstemmed A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
title_sort practical design method for reducing postconstruction settlement of highway subgrade induced by soil creep
publisher Hindawi-Wiley
publishDate 2021
url https://doaj.org/article/67c2b9d468554cd99b246cc095b2c505
work_keys_str_mv AT feizhou apracticaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT tangdaixia apracticaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT bingqiyu apracticaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT fanxia apracticaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT fanyu apracticaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT feizhou practicaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT tangdaixia practicaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT bingqiyu practicaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT fanxia practicaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
AT fanyu practicaldesignmethodforreducingpostconstructionsettlementofhighwaysubgradeinducedbysoilcreep
_version_ 1718428988857122816