A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is...
Guardado en:
Autores principales: | Fei Zhou, Tangdai Xia, Bingqi Yu, Fan Xia, Fan Yu |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Hindawi-Wiley
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/67c2b9d468554cd99b246cc095b2c505 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Study on the Creep Damage Characteristics of Shale under the Combined Action of Osmotic Pressure and Disturbance Load
por: Junguang Wang, et al.
Publicado: (2021) -
Creep Behavior of Saturated Clay in Triaxial Test and a Hyperbolic Model
por: Bin Xiao, et al.
Publicado: (2021) -
STEMMUS-UEB v1.0.0: integrated modeling of snowpack and soil water and energy transfer with three complexity levels of soil physical processes
por: L. Yu, et al.
Publicado: (2021) -
Aquiclude Stability Evaluation and Significance Analysis of Influencing Factors of Close-Distance Coal Seams: A Case Study of the Yili No. 4 Coal Mine in Xinjiang, China
por: Shuaishuai Liang, et al.
Publicado: (2021) -
Influence of Clay Fraction and Mineral Composition on Unsaturated Characteristics of Cohesive Foundation Soil in Airports
por: Jun Feng, et al.
Publicado: (2021)