Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the major challenges being faced by the construction and infrastructure sector. Hence, the aim of this study is to explore th...
Guardado en:
Autores principales: | Solomon Melaku Belay, Seifu Tilahun, Mitiku Yehualaw, Jose Matos, Helder Sousa, Endalew Temesgen Workneh |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Hindawi Limited
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/68700f77278746b380bad62df9086f23 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Optimización del overrun (aireado), de la dureza, la viscosidad y los costos de un helado mediante el diseño de mezclas
por: Jorge-Efraín Michue-Mango, et al.
Publicado: (2015) -
Optimal Scheduling of a Multi-Energy Microgrid
por: Nikolaos E. Koltsaklis, et al.
Publicado: (2021) -
Allocation of risk factors for geodetic tasks in construction schedules
por: Kowacka Magdalena, et al.
Publicado: (2021) -
Reclaimer Scheduling in Dry Bulk Terminals
por: Ozgur Unsal
Publicado: (2020) -
Transport Infrastructure in Ethiopia
por: A. K. Barinov
Publicado: (2018)