Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment
In this paper, we have developed the multi-item inventory model in the fuzzy environment. Here we considered the demand rate is constant and production cost is dependent on the demand rate. Set-up- cost is dependent on average inventory level as well as demand. Lead time crashing cost is considered...
Guardado en:
Autor principal: | |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Ayandegan Institute of Higher Education,
2020
|
Materias: | |
Acceso en línea: | https://doaj.org/article/68de64e79f6d4ef2803cf93c57a5ca1d |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:68de64e79f6d4ef2803cf93c57a5ca1d |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:68de64e79f6d4ef2803cf93c57a5ca1d2021-11-07T10:03:36ZMulti item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment2783-14422717-345310.22105/jfea.2020.254081.1025https://doaj.org/article/68de64e79f6d4ef2803cf93c57a5ca1d2020-09-01T00:00:00Zhttp://www.journal-fea.com/article_119244_d9d89ba4aab3e34f58ac8863394cab34.pdfhttps://doaj.org/toc/2783-1442https://doaj.org/toc/2717-3453In this paper, we have developed the multi-item inventory model in the fuzzy environment. Here we considered the demand rate is constant and production cost is dependent on the demand rate. Set-up- cost is dependent on average inventory level as well as demand. Lead time crashing cost is considered the continuous function of leading time. Limitation is considered on storage of space. Due to uncertainty all cost parameters of the proposed model are taken as generalized trapezoidal fuzzy numbers. Therefore this model is very real. The formulated multi objective inventory problem has been solved by various techniques like as Geometric Programming (GP) approach, Fuzzy Programming Technique with Hyperbolic Membership Function (FPTHMF), Fuzzy Nonlinear Programming (FNLP) technique and Fuzzy Additive Goal Programming (FAGP) technique. An example is given to illustrate the model. Sensitivity analysis and graphical representation have been shown to test the parameters of the model.Satya DasAyandegan Institute of Higher Education,articleinventorymulti-itemleading timegeneralized trapezoidal fuzzy numberfuzzy techniquesgp techniqueMathematicsQA1-939ENJournal of Fuzzy Extension and Applications, Vol 1, Iss 3, Pp 227-243 (2020) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
inventory multi-item leading time generalized trapezoidal fuzzy number fuzzy techniques gp technique Mathematics QA1-939 |
spellingShingle |
inventory multi-item leading time generalized trapezoidal fuzzy number fuzzy techniques gp technique Mathematics QA1-939 Satya Das Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
description |
In this paper, we have developed the multi-item inventory model in the fuzzy environment. Here we considered the demand rate is constant and production cost is dependent on the demand rate. Set-up- cost is dependent on average inventory level as well as demand. Lead time crashing cost is considered the continuous function of leading time. Limitation is considered on storage of space. Due to uncertainty all cost parameters of the proposed model are taken as generalized trapezoidal fuzzy numbers. Therefore this model is very real. The formulated multi objective inventory problem has been solved by various techniques like as Geometric Programming (GP) approach, Fuzzy Programming Technique with Hyperbolic Membership Function (FPTHMF), Fuzzy Nonlinear Programming (FNLP) technique and Fuzzy Additive Goal Programming (FAGP) technique. An example is given to illustrate the model. Sensitivity analysis and graphical representation have been shown to test the parameters of the model. |
format |
article |
author |
Satya Das |
author_facet |
Satya Das |
author_sort |
Satya Das |
title |
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
title_short |
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
title_full |
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
title_fullStr |
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
title_full_unstemmed |
Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
title_sort |
multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment |
publisher |
Ayandegan Institute of Higher Education, |
publishDate |
2020 |
url |
https://doaj.org/article/68de64e79f6d4ef2803cf93c57a5ca1d |
work_keys_str_mv |
AT satyadas multiiteminventorymodelincludeleadtimewithdemanddependentproductioncostandsetupcostinfuzzyenvironment |
_version_ |
1718443551103123456 |