Auxiliary air pressure balance mode for EPB shield tunneling in water-rich gravelly sand strata: Feasibility and soil conditioning

Machine loads are always high, or soil conditioning is required to be rigorous when the pressure chamber is full of excavated soil during earth pressure balance (EPB) shield tunneling. This study investigates the feasibility and soil conditioning of the auxiliary air pressure balance mode for EPB sh...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Shuying Wang, Pengfei Liu, Zhenyu Gong, Peng Yang
Formato: article
Lenguaje:EN
Publicado: Elsevier 2022
Materias:
Acceso en línea:https://doaj.org/article/6d42f307307843128145981e2109a311
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!

Ejemplares similares