Auxiliary air pressure balance mode for EPB shield tunneling in water-rich gravelly sand strata: Feasibility and soil conditioning
Machine loads are always high, or soil conditioning is required to be rigorous when the pressure chamber is full of excavated soil during earth pressure balance (EPB) shield tunneling. This study investigates the feasibility and soil conditioning of the auxiliary air pressure balance mode for EPB sh...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Elsevier
2022
|
Materias: | |
Acceso en línea: | https://doaj.org/article/6d42f307307843128145981e2109a311 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sea el primero en dejar un comentario!