Optimization Analysis of Excavation Procedure Design of Underground Powerhouses under High In Situ Stress in China
To recommend the excavation procedures and design parameters for underground powerhouses, excavation procedures of fifty-one underground powerhouses in China were summarized and analyzed based on in situ stress conditions. Firstly, the complex stress environment in China was introduced and fifty-one...
Saved in:
Main Authors: | Xiao Liu, Peng Yan, Ming Chen, Sheng Luo, Ang Lu, Wenbo Lu, Gaohui Wang, Shuling Huang |
---|---|
Format: | article |
Language: | EN |
Published: |
MDPI AG
2021
|
Subjects: | |
Online Access: | https://doaj.org/article/6e33f1f2635c4b7c86caa00a144e00e9 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Deformation and Failure Analyses of the Surrounding Rock Mass with an Interlayer Shear Zone in the Baihetan Underground Powerhouse
by: Fei Yuan, et al.
Published: (2021) -
Prerequisites for formation of underground spaces
by: Анастасия Холявко, et al.
Published: (2021) -
3D displacement discontinuity analysis of in-situ stress perturbation near a weak faul
by: Yutong Chai, et al.
Published: (2021) -
Characterization of Underlying Twin Shield Tunnels Due to Foundation-Excavation Unloading in Soft Soils: An Experimental and Numerical Study
by: Xiaodong Cheng, et al.
Published: (2021) -
Semantic IFC Data Model for Automatic Safety Risk Identification in Deep Excavation Projects
by: Yongcheng Zhang, et al.
Published: (2021)