Optimization Analysis of Excavation Procedure Design of Underground Powerhouses under High In Situ Stress in China
To recommend the excavation procedures and design parameters for underground powerhouses, excavation procedures of fifty-one underground powerhouses in China were summarized and analyzed based on in situ stress conditions. Firstly, the complex stress environment in China was introduced and fifty-one...
Enregistré dans:
Auteurs principaux: | Xiao Liu, Peng Yan, Ming Chen, Sheng Luo, Ang Lu, Wenbo Lu, Gaohui Wang, Shuling Huang |
---|---|
Format: | article |
Langue: | EN |
Publié: |
MDPI AG
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/6e33f1f2635c4b7c86caa00a144e00e9 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Deformation and Failure Analyses of the Surrounding Rock Mass with an Interlayer Shear Zone in the Baihetan Underground Powerhouse
par: Fei Yuan, et autres
Publié: (2021) -
Prerequisites for formation of underground spaces
par: Анастасия Холявко, et autres
Publié: (2021) -
3D displacement discontinuity analysis of in-situ stress perturbation near a weak faul
par: Yutong Chai, et autres
Publié: (2021) -
Characterization of Underlying Twin Shield Tunnels Due to Foundation-Excavation Unloading in Soft Soils: An Experimental and Numerical Study
par: Xiaodong Cheng, et autres
Publié: (2021) -
Semantic IFC Data Model for Automatic Safety Risk Identification in Deep Excavation Projects
par: Yongcheng Zhang, et autres
Publié: (2021)