Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid

Distributed generation (DG) specifically from solar energy is gaining much attention. Integration of solar photo-voltaic plant (SPP) on distribution grid increases flexibility of the system but lacking behind in terms of convention protection scheme. The impact of orientation of point of common coup...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Aayush Shrivastava, Devender Kumar Saini, Manjaree Pandit
Formato: article
Lenguaje:EN
Publicado: Taylor & Francis Group 2019
Materias:
Acceso en línea:https://doaj.org/article/71c72f1988234ed3ad336c8d7caa8229
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:71c72f1988234ed3ad336c8d7caa8229
record_format dspace
spelling oai:doaj.org-article:71c72f1988234ed3ad336c8d7caa82292021-11-04T15:51:55ZRelay co-ordination optimization for integrated solar photo-voltaic power distribution grid2331-191610.1080/23311916.2019.1612601https://doaj.org/article/71c72f1988234ed3ad336c8d7caa82292019-01-01T00:00:00Zhttp://dx.doi.org/10.1080/23311916.2019.1612601https://doaj.org/toc/2331-1916Distributed generation (DG) specifically from solar energy is gaining much attention. Integration of solar photo-voltaic plant (SPP) on distribution grid increases flexibility of the system but lacking behind in terms of convention protection scheme. The impact of orientation of point of common coupling (PCC) of SPP on distribution grid changes the entire power flow computation and hence, coordination of protection devices. This paper presents the power flow computation on modified IEEE 4-bus system for different integrated positions of SPP. Further analysis is carried for the fault current level with different locations and number of SPP DG. It has been found that DG integration increases the magnitudes of fault current; hence, it will have impact on relay co-ordination. A MATLAB/Simulink model is proposed for relay mis-coordination and optimal co-ordination by implementing evolutionary optimization technique. The Proposed study on IEEE 4-bus system along with three units 100 kW capacity of SPP is used to derived optimal co-ordination solution which validates the obtained results on electrical transient’s analysis programming platform (ETAP).Aayush ShrivastavaDevender Kumar SainiManjaree PanditTaylor & Francis Grouparticlerelay coordinationcoordination time interval (cti)particle swarm optimizationsolar pv distribution gridEngineering (General). Civil engineering (General)TA1-2040ENCogent Engineering, Vol 6, Iss 1 (2019)
institution DOAJ
collection DOAJ
language EN
topic relay coordination
coordination time interval (cti)
particle swarm optimization
solar pv distribution grid
Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle relay coordination
coordination time interval (cti)
particle swarm optimization
solar pv distribution grid
Engineering (General). Civil engineering (General)
TA1-2040
Aayush Shrivastava
Devender Kumar Saini
Manjaree Pandit
Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
description Distributed generation (DG) specifically from solar energy is gaining much attention. Integration of solar photo-voltaic plant (SPP) on distribution grid increases flexibility of the system but lacking behind in terms of convention protection scheme. The impact of orientation of point of common coupling (PCC) of SPP on distribution grid changes the entire power flow computation and hence, coordination of protection devices. This paper presents the power flow computation on modified IEEE 4-bus system for different integrated positions of SPP. Further analysis is carried for the fault current level with different locations and number of SPP DG. It has been found that DG integration increases the magnitudes of fault current; hence, it will have impact on relay co-ordination. A MATLAB/Simulink model is proposed for relay mis-coordination and optimal co-ordination by implementing evolutionary optimization technique. The Proposed study on IEEE 4-bus system along with three units 100 kW capacity of SPP is used to derived optimal co-ordination solution which validates the obtained results on electrical transient’s analysis programming platform (ETAP).
format article
author Aayush Shrivastava
Devender Kumar Saini
Manjaree Pandit
author_facet Aayush Shrivastava
Devender Kumar Saini
Manjaree Pandit
author_sort Aayush Shrivastava
title Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
title_short Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
title_full Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
title_fullStr Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
title_full_unstemmed Relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
title_sort relay co-ordination optimization for integrated solar photo-voltaic power distribution grid
publisher Taylor & Francis Group
publishDate 2019
url https://doaj.org/article/71c72f1988234ed3ad336c8d7caa8229
work_keys_str_mv AT aayushshrivastava relaycoordinationoptimizationforintegratedsolarphotovoltaicpowerdistributiongrid
AT devenderkumarsaini relaycoordinationoptimizationforintegratedsolarphotovoltaicpowerdistributiongrid
AT manjareepandit relaycoordinationoptimizationforintegratedsolarphotovoltaicpowerdistributiongrid
_version_ 1718444719869001728