Determination of construction process duration based on labor productivity estimation: A case study

Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the s...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Kubečková Darja, Smugala Stanislav
Formato: article
Lenguaje:EN
Publicado: Sciendo 2021
Materias:
Acceso en línea:https://doaj.org/article/784ce2c7d5124f3182e804808f14b0e7
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:784ce2c7d5124f3182e804808f14b0e7
record_format dspace
spelling oai:doaj.org-article:784ce2c7d5124f3182e804808f14b0e72021-12-05T14:11:09ZDetermination of construction process duration based on labor productivity estimation: A case study1847-622810.2478/otmcj-2021-0031https://doaj.org/article/784ce2c7d5124f3182e804808f14b0e72021-11-01T00:00:00Zhttps://doi.org/10.2478/otmcj-2021-0031https://doaj.org/toc/1847-6228Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes, and labor required for certain production in person-hours. This study applies statistical analyses and probability theories for plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses a decrease in the performance standard has been proved compared with the planned values given in the CONTEC database. The decrease in performance, which was also caused by the number of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was later confirmed by a relative frequency test. The measures taken were in terms of establishing the required number of personnel capacities for complying with the construction schedule.Kubečková DarjaSmugala StanislavSciendoarticlemean valuestandard deviationproductivitysample relative frequencyprobability theoryhypothesis testBuilding constructionTH1-9745ENOrganization, Technology and Management in Construction: An International Journal, Vol 13, Iss 2, Pp 2521-2538 (2021)
institution DOAJ
collection DOAJ
language EN
topic mean value
standard deviation
productivity
sample relative frequency
probability theory
hypothesis test
Building construction
TH1-9745
spellingShingle mean value
standard deviation
productivity
sample relative frequency
probability theory
hypothesis test
Building construction
TH1-9745
Kubečková Darja
Smugala Stanislav
Determination of construction process duration based on labor productivity estimation: A case study
description Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes, and labor required for certain production in person-hours. This study applies statistical analyses and probability theories for plastering work, which represents a labor-intensive construction process. The goal of the research is to determine the probability of completion of the construction process based on monitoring the mean value of performance. By application of statistical analyses a decrease in the performance standard has been proved compared with the planned values given in the CONTEC database. The decrease in performance, which was also caused by the number of days with unfavorable climatic conditions and demonstrated by performing interval estimates based on the collection of statistical data, was later confirmed by a relative frequency test. The measures taken were in terms of establishing the required number of personnel capacities for complying with the construction schedule.
format article
author Kubečková Darja
Smugala Stanislav
author_facet Kubečková Darja
Smugala Stanislav
author_sort Kubečková Darja
title Determination of construction process duration based on labor productivity estimation: A case study
title_short Determination of construction process duration based on labor productivity estimation: A case study
title_full Determination of construction process duration based on labor productivity estimation: A case study
title_fullStr Determination of construction process duration based on labor productivity estimation: A case study
title_full_unstemmed Determination of construction process duration based on labor productivity estimation: A case study
title_sort determination of construction process duration based on labor productivity estimation: a case study
publisher Sciendo
publishDate 2021
url https://doaj.org/article/784ce2c7d5124f3182e804808f14b0e7
work_keys_str_mv AT kubeckovadarja determinationofconstructionprocessdurationbasedonlaborproductivityestimationacasestudy
AT smugalastanislav determinationofconstructionprocessdurationbasedonlaborproductivityestimationacasestudy
_version_ 1718371364973314048