Determination of construction process duration based on labor productivity estimation: A case study
Monitoring labor productivity and how to decrease construction costs are the key issues in the planning process of a construction project. The CONTEC automated system combined with statistical methods assists in predicting the amount of time required to complete construction works according to the s...
Enregistré dans:
Auteurs principaux: | Kubečková Darja, Smugala Stanislav |
---|---|
Format: | article |
Langue: | EN |
Publié: |
Sciendo
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/784ce2c7d5124f3182e804808f14b0e7 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Selection of an appropriate ground motion records set for time history analysis using uniform hazard spectrum
par: Aliakbar Yahyaabadi, et autres
Publié: (2020) -
Sleep duration and fatigue in construction workers: A preliminary study
par: Ferrada Ximena, et autres
Publié: (2021) -
Cost Modeling from the Contractor Perspective: Application to Residential and Office Buildings
par: Francisco Pereira Monteiro, et autres
Publié: (2021) -
Diffuseness Quantification in a Reverberation Chamber and Its Variation with Fine-Resolution Measurements
par: Shuying Zhang, et autres
Publié: (2021) -
Implementation of the value re-engineering concept in the Nigerian construction industry: Exploratory study
par: Ibrahim Jibrin, et autres
Publié: (2021)