Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases

Objective: Selecting suppliers of industrial systems equipment to minimize the total construction and operation costs and implement it for Feed Water Multi-state System (FWS) of Heat Recovery Steam Generator (HRSG) boilers in Mapna Company. Methods: Using the Markov chain model results in a mathemat...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Mohammadjavad Shamsi, Mahmoud Shahrokhi
Formato: article
Lenguaje:FA
Publicado: University of Tehran 2020
Materias:
Acceso en línea:https://doaj.org/article/7c88ed88f87b4873a4e672742623eff6
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:7c88ed88f87b4873a4e672742623eff6
record_format dspace
spelling oai:doaj.org-article:7c88ed88f87b4873a4e672742623eff62021-11-14T05:49:28ZSelection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases2008-58852423-536910.22059/imj.2021.307002.1007768https://doaj.org/article/7c88ed88f87b4873a4e672742623eff62020-12-01T00:00:00Zhttps://imj.ut.ac.ir/article_83185_d9ff1286823c0a48de590ef8cbc9f7b1.pdfhttps://doaj.org/toc/2008-5885https://doaj.org/toc/2423-5369Objective: Selecting suppliers of industrial systems equipment to minimize the total construction and operation costs and implement it for Feed Water Multi-state System (FWS) of Heat Recovery Steam Generator (HRSG) boilers in Mapna Company. Methods: Using the Markov chain model results in a mathematical programming model and then analyzing the sensitivity of this model. First, using the Markov chain, different system states are drawn. Then, using the state transfer rate (failure rate and repair rate) of the equipment, the probability of the system being in any of these states is determined parametrically. Then, the Markov chain model results are added to the other constraints of a mathematical model the problem and solved by GAMS software. The effect of cost parameter changes on the optimal solution is calculated individually and then compared in a general graph. Results: The highest construction and operation costs are in ascending order: 1- the equipment purchasing price, 2- the production capacity reduction cost, 3- the system construction delay penalty, and 4- the system shutdown cost. Also, the relationship between the optimal solution to these parameters is linear in a wide range of changes. Conclusion: All costs have a direct effect on the design of the Feed Water System (purchase, delay, capacity reduction, and shutdown), but the cost of purchasing equipment has the most significant effect on the total cost. It is therefore recommended to focus entirely on reducing this cost.Mohammadjavad ShamsiMahmoud ShahrokhiUniversity of Tehranarticleblock diagram modelavailabilityreliabilitymarkov chainrepairable equipmentManagement. Industrial managementHD28-70FAمدیریت صنعتی, Vol 12, Iss 4, Pp 634-654 (2020)
institution DOAJ
collection DOAJ
language FA
topic block diagram model
availability
reliability
markov chain
repairable equipment
Management. Industrial management
HD28-70
spellingShingle block diagram model
availability
reliability
markov chain
repairable equipment
Management. Industrial management
HD28-70
Mohammadjavad Shamsi
Mahmoud Shahrokhi
Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
description Objective: Selecting suppliers of industrial systems equipment to minimize the total construction and operation costs and implement it for Feed Water Multi-state System (FWS) of Heat Recovery Steam Generator (HRSG) boilers in Mapna Company. Methods: Using the Markov chain model results in a mathematical programming model and then analyzing the sensitivity of this model. First, using the Markov chain, different system states are drawn. Then, using the state transfer rate (failure rate and repair rate) of the equipment, the probability of the system being in any of these states is determined parametrically. Then, the Markov chain model results are added to the other constraints of a mathematical model the problem and solved by GAMS software. The effect of cost parameter changes on the optimal solution is calculated individually and then compared in a general graph. Results: The highest construction and operation costs are in ascending order: 1- the equipment purchasing price, 2- the production capacity reduction cost, 3- the system construction delay penalty, and 4- the system shutdown cost. Also, the relationship between the optimal solution to these parameters is linear in a wide range of changes. Conclusion: All costs have a direct effect on the design of the Feed Water System (purchase, delay, capacity reduction, and shutdown), but the cost of purchasing equipment has the most significant effect on the total cost. It is therefore recommended to focus entirely on reducing this cost.
format article
author Mohammadjavad Shamsi
Mahmoud Shahrokhi
author_facet Mohammadjavad Shamsi
Mahmoud Shahrokhi
author_sort Mohammadjavad Shamsi
title Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
title_short Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
title_full Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
title_fullStr Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
title_full_unstemmed Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
title_sort selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
publisher University of Tehran
publishDate 2020
url https://doaj.org/article/7c88ed88f87b4873a4e672742623eff6
work_keys_str_mv AT mohammadjavadshamsi selectionofsuppliersofrepairableequipmentwiththeaimofminimizingcostsintheconstructionandoperationphases
AT mahmoudshahrokhi selectionofsuppliersofrepairableequipmentwiththeaimofminimizingcostsintheconstructionandoperationphases
_version_ 1718429906778456064