Selection of suppliers of repairable equipment with the aim of minimizing costs in the construction and operation phases
Objective: Selecting suppliers of industrial systems equipment to minimize the total construction and operation costs and implement it for Feed Water Multi-state System (FWS) of Heat Recovery Steam Generator (HRSG) boilers in Mapna Company. Methods: Using the Markov chain model results in a mathemat...
Guardado en:
Autores principales: | Mohammadjavad Shamsi, Mahmoud Shahrokhi |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
University of Tehran
2020
|
Materias: | |
Acceso en línea: | https://doaj.org/article/7c88ed88f87b4873a4e672742623eff6 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Analisis Sistem Reliability dengan Pendekatan Reliability Block Diagram
por: Rifda Ilahy Rosihan, et al.
Publicado: (2019) -
MODELING OF PROCESSES OF REPAIR OF ENERGY EQUIPMENT
por: A. Ievlev
Publicado: (2017) -
Methods to improve the efficiency of the business process of repairing power-generating equipment
por: Vasilyevich Pakhomov Sergey, et al.
Publicado: (2021) -
FORMATION OF COSTS AND CALCULATION OF THE COST OF MAINTENANCE OF IMPLEMENTED LABORATORY MEDICAL EQUIPMENT
por: E. Shapoval, et al.
Publicado: (2017) -
Pengukuran Efektivitas Kinerja Excavator pada Pengupasan Overburden (OB) Menggunakan Metode Overall Equipment Effectiveness (OEE): Studi Kasus di Pit 7 PT XYZ Kintap, Kalimantan Selatan
por: Sangaji Agung Wicaksono, et al.
Publicado: (2021)