Heat demand forecasting in District Heating Network using XGBoost algorithm
Forecasting an hourly heat demand during different periods of district heating network operation is essential to optimize heat production in the CHP plant. The paper presents the heat demand model in the real district heating system with a peak load of 200 MW. The predictive model was developed with...
Guardado en:
Autores principales: | Bujalski Maciej, Madejski Paweł, Fuzowski Krzysztof |
---|---|
Formato: | article |
Lenguaje: | EN FR |
Publicado: |
EDP Sciences
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/81c8026fe87040349a1deb42d6ddc4dd |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
A hybrid district heating substation with an adsorption chiller and PCM storage units: a concept and preliminary study
por: Szczęśniak Arkadiusz, et al.
Publicado: (2021) -
Analysis of renewable energy sources and a heat storage tank application in a district heating substation
por: Chłosta Kamil, et al.
Publicado: (2021) -
Determining the possibility of placing turbine systems for hydraulic regulation and production of electrical energy in the District Heating Network in Krakow
por: Natkaniec Piotr, et al.
Publicado: (2021) -
Sensitivity analysis of heat transfers in an asymmetrically heated turbulent channel flow
por: David Martin, et al.
Publicado: (2021) -
Performance of a flat grooved heat pipe with a localized heat load
por: Sezmen Ramazan Aykut, et al.
Publicado: (2021)