Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources
The present work aimed at improving the quality of operational risk estimation for power substations and increasing the efficiency in its reduction using models and methods of multicriteria decision-making. The application of the proposed methodology allows one to assess, compare, prioritize, and/or...
Guardado en:
Autores principales: | , , , , , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
IEEE
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/824ee3c2cfd74143af2669f63b889edd |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:824ee3c2cfd74143af2669f63b889edd |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:824ee3c2cfd74143af2669f63b889edd2021-11-18T00:03:09ZEvaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources2169-353610.1109/ACCESS.2021.3124529https://doaj.org/article/824ee3c2cfd74143af2669f63b889edd2021-01-01T00:00:00Zhttps://ieeexplore.ieee.org/document/9597525/https://doaj.org/toc/2169-3536The present work aimed at improving the quality of operational risk estimation for power substations and increasing the efficiency in its reduction using models and methods of multicriteria decision-making. The application of the proposed methodology allows one to assess, compare, prioritize, and/or order power substations from the point of view of operational risks and to rationally allocate available resources to reduce operational risks. It is presented a method of Systemic Risk Assessment (SRA) that integrates concepts of risk assessment and multicriteria decision-making techniques. The use of SRA permits one to take into account expert opinions to obtain the operational risk estimates. These estimates serve for allocating resources between substations within the framework of multicriteria models. The analysis is based on applying the Bellman-Zadeh approach to decision-making in a fuzzy environment to solve multicriteria problems and provide their harmonious solutions. The risk assessment results of the three power substations show that the power substation (PS)2 has the highest risk level (0.314), followed by PS1 (0.267), and PS3 (0.199), and the allocation of financial resources between the substations is the following: PS1: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula>465,000.00, PS2: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula> 1,714,339.00 and PS3: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula> 820,661.00. The Case Study, demonstrates the possibility of reducing the subjectivity of the risk evaluation and the improvement of the quality of the decisions made in resource allocation.Willian MaiaPetr EkelDouglas Alexandre Gomes VieiraEduardo Antonio de CastroMateus Alberto Dorna de OliveiraIgor Marques ReisKenedy Marconi Geraldo Dos SantosIEEEarticleAccident preventionallocation of resourcesAHPBellman-Zadeh approachdecision makingElectrical safetyElectrical engineering. Electronics. Nuclear engineeringTK1-9971ENIEEE Access, Vol 9, Pp 149383-149397 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
Accident prevention allocation of resources AHP Bellman-Zadeh approach decision making Electrical safety Electrical engineering. Electronics. Nuclear engineering TK1-9971 |
spellingShingle |
Accident prevention allocation of resources AHP Bellman-Zadeh approach decision making Electrical safety Electrical engineering. Electronics. Nuclear engineering TK1-9971 Willian Maia Petr Ekel Douglas Alexandre Gomes Vieira Eduardo Antonio de Castro Mateus Alberto Dorna de Oliveira Igor Marques Reis Kenedy Marconi Geraldo Dos Santos Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
description |
The present work aimed at improving the quality of operational risk estimation for power substations and increasing the efficiency in its reduction using models and methods of multicriteria decision-making. The application of the proposed methodology allows one to assess, compare, prioritize, and/or order power substations from the point of view of operational risks and to rationally allocate available resources to reduce operational risks. It is presented a method of Systemic Risk Assessment (SRA) that integrates concepts of risk assessment and multicriteria decision-making techniques. The use of SRA permits one to take into account expert opinions to obtain the operational risk estimates. These estimates serve for allocating resources between substations within the framework of multicriteria models. The analysis is based on applying the Bellman-Zadeh approach to decision-making in a fuzzy environment to solve multicriteria problems and provide their harmonious solutions. The risk assessment results of the three power substations show that the power substation (PS)2 has the highest risk level (0.314), followed by PS1 (0.267), and PS3 (0.199), and the allocation of financial resources between the substations is the following: PS1: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula>465,000.00, PS2: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula> 1,714,339.00 and PS3: <italic>R</italic><inline-formula> <tex-math notation="LaTeX">$\$ $ </tex-math></inline-formula> 820,661.00. The Case Study, demonstrates the possibility of reducing the subjectivity of the risk evaluation and the improvement of the quality of the decisions made in resource allocation. |
format |
article |
author |
Willian Maia Petr Ekel Douglas Alexandre Gomes Vieira Eduardo Antonio de Castro Mateus Alberto Dorna de Oliveira Igor Marques Reis Kenedy Marconi Geraldo Dos Santos |
author_facet |
Willian Maia Petr Ekel Douglas Alexandre Gomes Vieira Eduardo Antonio de Castro Mateus Alberto Dorna de Oliveira Igor Marques Reis Kenedy Marconi Geraldo Dos Santos |
author_sort |
Willian Maia |
title |
Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
title_short |
Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
title_full |
Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
title_fullStr |
Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
title_full_unstemmed |
Evaluation of Operational Risk in Power Substations and Its Rational Reduction on the Basis of Multicriteria Allocating Resources |
title_sort |
evaluation of operational risk in power substations and its rational reduction on the basis of multicriteria allocating resources |
publisher |
IEEE |
publishDate |
2021 |
url |
https://doaj.org/article/824ee3c2cfd74143af2669f63b889edd |
work_keys_str_mv |
AT willianmaia evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT petrekel evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT douglasalexandregomesvieira evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT eduardoantoniodecastro evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT mateusalbertodornadeoliveira evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT igormarquesreis evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources AT kenedymarconigeraldodossantos evaluationofoperationalriskinpowersubstationsanditsrationalreductiononthebasisofmulticriteriaallocatingresources |
_version_ |
1718425233898078208 |