Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland
Case studies available in the literature clearly point to the numerous benefits of BIM (Building Information Modeling), in addition to the barriers that participants of such projects may face. This paper is a case study of Employer’s Information Requirements (EIR) for preparing and managing BIM mode...
Guardado en:
Autores principales: | , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/8a91dab3d7264dcfb92975ec0ff70e7a |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:8a91dab3d7264dcfb92975ec0ff70e7a |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:8a91dab3d7264dcfb92975ec0ff70e7a2021-11-25T16:32:14ZEmployer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland10.3390/app1122105872076-3417https://doaj.org/article/8a91dab3d7264dcfb92975ec0ff70e7a2021-11-01T00:00:00Zhttps://www.mdpi.com/2076-3417/11/22/10587https://doaj.org/toc/2076-3417Case studies available in the literature clearly point to the numerous benefits of BIM (Building Information Modeling), in addition to the barriers that participants of such projects may face. This paper is a case study of Employer’s Information Requirements (EIR) for preparing and managing BIM models in the design and construction of selected large public construction projects: the Cogiteon Lesser Poland Science Center (LPSC Cogiteon), the Krakow Music Center (KMC) and the Copernican Revolution Studio (CRS). The paper presents the main aspects included in EIRs. It discusses the technical (e.g., requirements for the Common Data Environment platform—CDE), management (including the scopes of responsibility of staff in charge of BIM) and strategic sections (primary expectations concerning Data Drops) of the EIR. Projects executed using BIM by public institutions allow for the application of insight gained as a result of their completion and the creation of a knowledge base or checklist for future projects. The projects discussed here, carried out using advanced BIM solutions, could potentially be developed further by the proposed content extension concerning levels of detail (this paper cites potential guidelines that can be applied), component elements concerning price and qualifications, so as to easily generate bills of costs, and information used in facility management which can also encourage facility manager cooperation. Examples of EIR provisions are presented based on an analysis of three completed construction projects carried out using advanced BIM solutions. BIM is still a new form of management and this paper expands the range of available EIR standards, in addition to presenting guidelines for their practical application in the construction industry.Krzysztof ZimaEwelina Mitera-KiełbasaMDPI AGarticleBIMEIR employer’s information requirementsCDE common data environmentTechnologyTEngineering (General). Civil engineering (General)TA1-2040Biology (General)QH301-705.5PhysicsQC1-999ChemistryQD1-999ENApplied Sciences, Vol 11, Iss 10587, p 10587 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
BIM EIR employer’s information requirements CDE common data environment Technology T Engineering (General). Civil engineering (General) TA1-2040 Biology (General) QH301-705.5 Physics QC1-999 Chemistry QD1-999 |
spellingShingle |
BIM EIR employer’s information requirements CDE common data environment Technology T Engineering (General). Civil engineering (General) TA1-2040 Biology (General) QH301-705.5 Physics QC1-999 Chemistry QD1-999 Krzysztof Zima Ewelina Mitera-Kiełbasa Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
description |
Case studies available in the literature clearly point to the numerous benefits of BIM (Building Information Modeling), in addition to the barriers that participants of such projects may face. This paper is a case study of Employer’s Information Requirements (EIR) for preparing and managing BIM models in the design and construction of selected large public construction projects: the Cogiteon Lesser Poland Science Center (LPSC Cogiteon), the Krakow Music Center (KMC) and the Copernican Revolution Studio (CRS). The paper presents the main aspects included in EIRs. It discusses the technical (e.g., requirements for the Common Data Environment platform—CDE), management (including the scopes of responsibility of staff in charge of BIM) and strategic sections (primary expectations concerning Data Drops) of the EIR. Projects executed using BIM by public institutions allow for the application of insight gained as a result of their completion and the creation of a knowledge base or checklist for future projects. The projects discussed here, carried out using advanced BIM solutions, could potentially be developed further by the proposed content extension concerning levels of detail (this paper cites potential guidelines that can be applied), component elements concerning price and qualifications, so as to easily generate bills of costs, and information used in facility management which can also encourage facility manager cooperation. Examples of EIR provisions are presented based on an analysis of three completed construction projects carried out using advanced BIM solutions. BIM is still a new form of management and this paper expands the range of available EIR standards, in addition to presenting guidelines for their practical application in the construction industry. |
format |
article |
author |
Krzysztof Zima Ewelina Mitera-Kiełbasa |
author_facet |
Krzysztof Zima Ewelina Mitera-Kiełbasa |
author_sort |
Krzysztof Zima |
title |
Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
title_short |
Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
title_full |
Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
title_fullStr |
Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
title_full_unstemmed |
Employer’s Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland |
title_sort |
employer’s information requirements: a case study implementation of bim on the example of selected construction projects in poland |
publisher |
MDPI AG |
publishDate |
2021 |
url |
https://doaj.org/article/8a91dab3d7264dcfb92975ec0ff70e7a |
work_keys_str_mv |
AT krzysztofzima employersinformationrequirementsacasestudyimplementationofbimontheexampleofselectedconstructionprojectsinpoland AT ewelinamiterakiełbasa employersinformationrequirementsacasestudyimplementationofbimontheexampleofselectedconstructionprojectsinpoland |
_version_ |
1718413149537828864 |